Vurra County
Constituency in Arua District
Named directly
Newest first.
2026
July 2026
A member thanked a former general for ensuring West Nile received national funds, which helped bring electricity, roads and the Laropi Bridge. The member highlighted a $20 million loan for the Nebbi‑Goli‑Vurra road and urged the Ministry to complete tarmacking to Zombo.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I stand before you to pay tribute to a great General and servant of the people of West Nile. A lot has been said about what the great General has done for us, as the people of West Nile, but one of the things we do appreciate him for is that he always made sure that West Nile got its fair share of the national cake. Through that, we have managed to get electricity, roads, and the famous Laropi Bridge funding - which is going to start - a bridge championed by the great General who is lying before us. As new Members of this Parliament, some of us who are in the second term came towards the last years of the great General, but nevertheless, he always got time to call us into his office and continued guiding us on some of the projects and issues to raise. One of the issues was the road between Nebbi to Goli and all the way to Vurra. Now that we managed to pass a loan of $20 million for that road, we urge the Ministry of Works and Transport to fulfil that pledge and make sure that that road from Nebbi, Goli to Zombo is tarmacked. I thank you all and welcome you to West Nile tomorrow for the burial of the General.
A member expressed condolences for the late Gen. Moses Ali, praised him as a peace builder who helped protect women in Pakwach and Jonam, and thanked him for his work in West Nile. The speaker also mentioned the need to improve the Nebbi‑Vurra road.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. On behalf of the people of Pakwach, allow me to extend my heartfelt condolences to the President, to you, the Speaker of Parliament, and the family of the late Gen. (Rtd) Moses Ali. I stand here to testify about the late Gen. Moses Ali as a peace builder. In 1986, I was a young girl; one morning, three vehicles appeared and parked in our compound. Soldiers jumped out, and my late father was seated under a tree. Out of the car, a towering tall soldier emerged - who was our late elder. I started beckoning to my father because I was bringing something to him. He whispered to me and said, “Run away.” All the girls and women ran away and why was that? Because it was well known that soldiers were very good at raping women. That is why my dad asked us to run away, although later on, we were all called back. He had been sent to go and talk to my father, who was a prominent opinion leader, to mobilise the people of Jonam to welcome the NRA with green leaves. Indeed, today, as people of West Nile, we have lost a general who fought to see that there is peace in West Nile and saw to it that women are no longer raped by the current UPDF. For that, we thank him. Mr Speaker, somebody here stated, “We should not pay tribute by just talking but rather with action.” The President mentioned two of our critical roads, both of which are of economic value. The Nebbi-Vurra road and Panyimur– Wadelai–Obongi road - (Member timed out.)
A member said the President will start road work on the Goli-Paidha-Zombo-Warr-Vurra Road in April, using the same contractor as for Nebbi-Goli Road, and asked if the contract is signed and how long Zombo District must wait.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker and congratulations. On 11 October 2025, the President came for a campaign in Zombo District. During the rally, he confirmed to the people of Zombo that work on Goli-Paidha-Zombo-Warr-Vurra Road would commence in April this year. He said that the same contractor that would do work on Nebbi-Goli Road would continue to Zombo. Has the contract been signed? If not, how long do we have to wait as the people of Zombo District? Thank you.
May 2026
The sentence that names Vurra County
“Lenia Charity Kevin Vurra County Arua NRM 72.”
Read the full speech, word for word
9 THE TWELFTH PARLIAMENT OF UGANDA THURSDAY, 14 MAY 2026 56. Kirungi Annet Pamela Woman Representative Kabarole NRM 57. Kyogabiirwe Jackie Muganda Woman Representative Kyegegwa NRM 58. Lanyero Christine Awany Woman Representative Nwoya NRM 59. Logose Sarah Annet Woman Representative Butaleja NRM 60. Lokii John Baptist (Dr) Matheniko County Moroto NRM 61. Lokoru Albert Tepeth County Moroto Independent 62. Lokoru Stephenson Yoyo Chekwii East County Nakapiripirit NRM 63. Longoli Simon Peter Chekwii County (Kadam) Nakapiripirit NRM 64. Lubega George Willy Bugangaizi South County Kakumiro NRM 65. Lubowa Ssebina Gyaviira Nyendo-Mukungwe County Masaka City NUP 66. Lugoloobi Amos Ntenjeru County North Kayunga NRM 67. Kiwanuka Sulaiman Nakifuma County Mukono NUP 68. Kuteesa Mary Kamuli Mwenge County South Kyenjojo NRM 69. Kyeyune Ivan Nakasongola County Nakasongola NUP 70. Lakisa Mercy Faith Woman Representative Alebtong NRM 71. Lenia Charity Kevin Vurra County Arua NRM 72. Mutebi Benard Mugoya Bulamogi County Kaliro Independent 73. Katooko Sylivia Damba Woman Representative Kibuku NRM 74. Kayogera Yona Busiki North County Namutumba Independent 75. Kiti Peter T’oo County Bukwo NRM 76. Lolem Micah Akasile Upe County Amudat NRM 77. Locap Peterkhen Bokora East County Napak NRM 78. Linda Irene City Woman Representative Fort Portal City NRM 79. Lokubal Emma Woman Representative Nabilatuk NRM 80. Katusiime Adrine Woman Representative Sheema NRM 81. Loluk Fidelis Logwee Napore West County Karenga Independent 82. Komakech Christopher Aruu County Pader NRM 83. Muzaid Khemis Arua Central Division Arua City FDC 84. Lamwaka Catherine Woman Representative Omoro NRM 85. Kiwanuka Abdallah Mukono County North Mukono NUP 86. Kyeyune Haruna Kasolo Kyotera County Kyotera NRM (The House was suspended at 11.42 a.m.) (On resumption at 1.00 p.m., the Deputy Clerk, Parliamentary Affairs presiding.) 87. Lokwang Hillary Ik County Kaabong NRM 88. Lowila CD Oketayot Woman Representative Pader NRM 89. Lugoloobi Willy Bageyente Bujumba County Kalangala NRM 90. Lugwar Benson Agogo North County Agago Independent 91. Lukyamuzi David Kalwanga Busujju County Mityana NUP 92. Kiwanuka Keefa Kiboga East County Kiboga NRM 93. Maala Zahrah Luyirika Makindye Division West Kampala NUP 94. Makumbi Henry Kamya Mityana County South Mityana NRM 95. Mariam Seif Woman Representative Iganga NRM 96. Mafabi Asha Nabulo Woman Representative Sironko NRM 97. Mamawi James Adjumani East County Adjumani Independent 98. Masaba Karim Industrial Division Mbale City Independent 99. Matembu Chriss Wataka Bubulo County West Manafwa Independent 100. Matovu Emmanuel Magoola Busiro County East Wakiso Independent 101. Mawanda Micheal Maranga Igara County East Bushenyi NRM
2025
April 2025
A member highlighted the Nebbi‑Goli‑Zombo‑Vurra road, calling it a toxic political road. He noted that the 14‑km stretch between Nebbi and Goli has been promised since 1996 but is missing from the budget, asking the minister what will be done before elections.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I want to bring to the attention of the august House the Nebbi-Goli-Zombo-Vurra Road. The minister is very familiar with it, and it is a huge toxic political road in that region. Currently, DRC is our biggest trading partner. The distance between Nebbi and Goli is only 14 kilometres, but the Government has been promising to work on the 14 kilometres since 1996. I perused this budget, which was read before Parliament this afternoon, but to my dismay, Goli-Nebbi is not featured anywhere. Can the minister, for God’s sake, tell the people of Uganda and the Alur people, where he worked for a very long time and got blessings to be a minister of Works, what he is going to do for them before these coming elections? Thank you very much.
A member expressed disappointment that the Nebbi‑Goli‑Zombo‑Vurra Road was omitted from this year’s budget, warning that the lack of funding could cost the NRM many votes in the upcoming election.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I would like to start by reiterating my greatest disappointment that, once again, Nebbi-Goli- Zombo-Vurra Road has missed out on this year’s budget. Mr Speaker, Sir, we are on the verge of losing a lot of votes because of this road, in the upcoming election, yet this is a stronghold of the National Resistance Movement (NRM) party.
A member complained that the Nebbi‑to‑Vurra road remains unrepaired despite promises, and that the Alui‑Nebbi road is delayed because of insufficient funding to the China Railway Company. They also asked for more road funds for subcounties and bridge repairs.
Summary written by a computer
Read the full speech, word for word
17140 BUDGET ESTIMATES FOR THE FY 2025/2026 We have taken great officials there. We took Ms Kagina, the then Executive Director of Uganda National Roads Authority (UNRA). We drove through the entire stretch of the road, but she still promised us air. We took you, the honourable minister, and drove through the entire stretch of the road from Nebbi to Vurra. Still, you promised us air. His Excellency the President has been there three times and proclaimed that the road was going to be repaired. Up to now, there is nothing. We hope something is done very soon, before the elections. Secondly, the Alui-Nebbi road has faced tremendous delays up to now. That project was supposed to have ended a long time ago, and the reason is because you are not providing enough funding to the China Railway Company to complete it. On the issue of the Uganda Road Fund, most of our districts last received funds in the second quarter. We are really in dire need of that money, especially our subcounties. While on the issue of subcounties, what is happening in the Ministry of Finance in regards to coding the new subcounties and town councils? They have failed to get road funds because they have failed to code them. Lastly, on the issue of district bridges, they are now almost finished. In my constituency, we have Ayila, Kibira and Pajukwi bridges, which are almost death traps. What are your plans for helping districts build and maintain their bridges? We need your help. Thank you very much.
A member asked the government to give more money to the Ministry of Health so that boat ambulances have set schedules, new call centres are built, and emergency units at Entebbe, Vurra and other borders are ready. The request also covers a new organ transplant council and better mortuary facilities.
Summary written by a computer
Read the full speech, word for word
17006 APPROVAL OF BUDGET ESTIMATES FOR FY 2025/2026 iii) The Ministry of Health should allocate specific times and days when the boat ambulances should move so that the public is aware of the schedules. iv) More funds should be provided to complete and add more regional call dispatch centres. 8) The organ transplant council The Human Organ Donation and Transplant Act was assented to by the President, but we do not have a council. Therefore, we need to set up a council and if operationalised, it will be responsible for sanctioning applications of donation and transplant, setting guidelines, quality control, supervision and monitoring of organ donation and transport industry. This reduces the cases seeking these services abroad. The recommendation The committee strongly recommends that Shs 5 billion be provided to the Ministry of Health to operationalise the Uganda Organ and Donation Transplant Council. 9) Underfunding for public health emergency preparations Under the public health and emergency preparations, I go straight to the recommendation. i) We need Shs 3 billion to be provided to the Ministry of Health for it to get prepared for any emergency outbreaks by establishing and functionalising the point of entry health units at Entebbe, Malaba, Busia, Vurra and Cyanika. ii) Shs 4 billion be provided to support the Ministry of Health in operationalising the national and regional public health emergency operation centres to respond to outbreaks. 10) Inadequate counterpart funding under Global Fund On inadequate counterpart funding under the Global Fund, the committee recommends that Shs 9.6 billion be provided as the counterpart funding for HIV/AIDS, TB and malaria control projects because this is a requirement. 11) Status of mortuaries On the status of mortuaries in health facilities, most of our facilities do not have mortuaries, and those which have are dilapidated and lack equipment. Recommendation The committee recommends that the Ministry of Health should prioritise modernising mortuary facilities by providing necessary equipment, expanding their capacity and ensuring adequate training for personnel to improve the overall quality of mortuary services in most health facilities. 12) Support to the Uganda Red Cross Uganda Red Cross supports the Ministry of Health in emergency services, like outbreak responses and blood donation mobilisation. Recommendation The committee recommends that an additional Shs 3.7 billion be provided to the Uganda Red Cross Society to enable them to - the committee recommends that an additional Shs 3.7 billion be provided to Uganda Red Cross Society to enable them to support the Ministry of Health in emergency services, disease outbreak responses and blood donation mobilisation. On page 24, on Community Health Extension Workers (CHEWs), the Ministry of Health reports that an increment of Shs 2 billion is required, as counterpart funding, for the CHEWs programme that is currently supported by donors, to strengthen disease prevention and promotion of public health activities. The committee recommends that an additional Shs 2 billion be provided to the Ministry of Health for counterpart funding
Canine units will be expanded to Vurra and other locations, but the unit needs better transport for sniffer dogs. An extra Shs 2.259 billion is requested for the expansion, and Shs 28.44 billion for transport equipment.
Summary written by a computer
Read the full speech, word for word
16835 THE ELEVENTH PARLIAMENT OF UGANDA WEDNESDAY, 9 APRIL 2025 On the overall performance of the budget under the UPF, we recommend reallocating funds from the assistance to Uganda Police Force projects to critical UPF areas. Uganda Police Force must create a comprehensive successor project for nationwide investments. The second recommendation is that the Uganda Police Force should expedite the preparation and approval processes of the CCTV Phase III Project to ensure its inclusion in the national plan budget. We reviewed the traffic and road safety and, therefore, recommend as follows: 1. An additional Shs 7.577 billion for transport equipment be provided; 2. Shs 1 billion for an IOV inspection lane and certification centre to be provided; 3. Shs 18 billion for 10 mobile inspection stations for IOV to be provided; 4. Uganda Police Force should link the EPS to the NIRA database; and 5. Uganda’s driver licensing system should be adjusted to capture details of foreigners who commit traffic offences. On police accommodation and the ongoing construction projects, we note that 74 per cent of the police officers lack institutional accommodation. However, the Uganda Police Force is working on a police accommodation project. This project is excluded from PIP. The Ministry of Internal Affairs plans to build 69,000 housing units for the Uganda Police Force and Uganda Prisons Service, and the DCIC, through a PPP arrangement. We, therefore, recommend that the Uganda Police Force accelerates the completion of the accommodation project to comprehensively address police accommodation challenges in the year 2025/2026. On the subcounty policing model – this is a flagship security solution to the country, initiated by His Excellency, the President, and it is now under implementation. The model aims to use limited resources in subcounties to improve policing services for communities, including establishing a police station in each area, following: 1. Deployment of a minimum of 18 personnel; 2. Two motorcycles per police station; 3. A counter phone and radio communication; 4. An office; and 5. Staff accommodation for at least 18 personnel. The Uganda Police Force has tested this model in Greater Masaka in the Financial Year 2023/2024, establishing 892, which is 41 per cent of the 2,190 subcounties, nationwide. In the Financial Year 2025/2026, Shs 5 billion is allocated for the construction of 30 model police stations and completing 11 in greater Masaka, along with acquiring 333 motorcycles and communication equipment. However, there is a funding gap of Shs 557 billion. We, therefore, recommend that Shs 587 billion be provided for the nationwide rollout of the subcounty policing model. On crime management, we recommend that Shs 17 billion be provided for CIID investigations and Shs 2.3 billion for crime intelligence in the Financial Year 2025/2026. On the Canine Unit, we see that expanding the Canine units to 36 locations of Budaka, Bukomansimbi, Butambala, Zombo, Adjumani, Madi-Okollo, Pakwach, Vurra, Kaberamaido, Koboko, Terego, Maracha, Moyo, Ayivuni, Buyende, Kaliro, Namutumba, Ngora, Hima, Namisindwa, Kwania, Agago, Nwoya, Amuru, Kyankwanzi, Apac, Kole, aerodromes and border points of Jinja, Soroti, Arua, Mbarara, Kisoro, Mpondwe, Katuna and Mirama Hills nationwide, requires an additional Shs 2.259 billion. The unit faces challenges with unreliable transport for sniffer dogs to crime scenes. Reliable transport is needed at the district stations, requiring Shs 28.44 billion for equipment in 29 regions.
March 2025
A member said the Alaa River burst, cutting off a health centre, market and the subcounty in Vurra. He asked ministries to visit and help.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. Allow me to join my colleagues in congratulating you on behalf of the people of Vurra constituency, Arua district. I have one matter of national importance. Alaa River which connects Obaru, Ombokoro and Nyirivu villages in the Ajia subcounty, Vurra County, Arua District burst and cut off a health centre III, Ajia market and Ajia subcounty. My prayer is that the responsible ministries should kindly consider visiting the area for an assessment and intervene in this matter. I beg to submit.
February 2025
The road through Vurra is being upgraded. Feasibility studies finished in 2018, and civil works should start in FY2025/26. Only the Odrua bridge is under construction; other bridges are single‑lane and will be upgraded later.
Summary written by a computer
Read the full speech, word for word
16533 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 27 FEBRUARY 2025 they occupy, the asset inventory for the PAPs on public land in Nakawa East Constituency was updated and new valuation reports were compiled. The review of these reports is being finalised for submission to the Chief Government Valuer by the end of this month. After approval by the Chief Government Valuer, the values will be disclosed to the affected persons. The second question came from Hon. Lawrence Songa, MP for Ora County, Zombo. The 120-kilometre Nebbi-Goli-Paidha-Padea- Zombo-Zeu-Warr-Vurra-Lia-Adramacaku Economic, Revenue Generating and Border Security Road appeared in NDP II, NDP III and the NRM manifesto. Why is it still appearing to be at the feasibility stage in the NDP IV, yet the final detailed engineering design for tarmacking was completed in March 2018? Madam Speaker, the feasibility studies and detailed designs for the upgrading of the Goli- Paidha-Zombo-Zeu-Warr-Vurra (l00km) and Arua-Lia (15km) was completed in March 2018. The Ministry of Works and Transport is in touch with the Ministry of Finance, Planning and Economic Development to ensure commencement of the procurement of the civil works contractor. Civil works are expected to commence in the Financial Year 2025/2026. His second prayer was: What is the progress of seeking funding from BADEA, African Development Bank and others for prioritising the tarmacking of this road in NDPIV? My response, is that BADEA carried out an appraisal for the upgrading of Nebbi-Goli (16km) during the period 26 February to 4 March 2024 and are currently in discussions with the Ministry of Finance, Planning and Economic Development for the financing of this road. His prayer number three was: why is the construction of bridges, including Adoka, Umol, Aniza, Ora, Nyagak and Ayuda, moving slowly? My response is that for the bridges; Adoka (Odrua), Omolo (Umol), Aniza, Ora, Nyagak and Ayuda along Nebbi-Paidha-Padea-Zombo- Zeu-Warr-Vurra-Lia, only Odrua Bridge is under construction with the bridge structure complete and the construction of access roads ongoing. Umol, Aniza, Ora, Nyagak and Ayuda are in fair condition, although they are single lane. They will be upgraded during the upgrading of Vurra-Goli-Nebbi Road. The contractor is already on site. His prayer number four was: Can Dei- Panyimur-Pakwach-Wadelai-Rhino Camp- Obongi-Laropi-Dufile economic, tourism and security road be included and fast-tracked as an oil road, since it is in the oil belt? My response is that oil roads are those meant to facilitate the exploitation and transportation of oil. The Ministry of Works and Transport will engage the Ministry of Energy and Mineral Development to assess and advise whether the stated are oil roads. Feasibility studies and detailed designs will be carried out in the medium-term, as resources may permit. Question number three came from Hon. Shartsi Kutesa Musherure, the MP, Mawogola County. Her first prayer was: With the successful launch of Electricity Access Scale-Up Project, could the Prime Minister explain why there has been a delay in the project’s implementation? My response is that the Electricity Access Scale-up Project (EASP) was designed to increase consumer connections in the country by targeting over one million new connections. Connections commenced in March 2024 and over 100,000 new consumers have so far been connected. The connections are limited to no- pole and one-pole service, on a first come, first served basis. The connections programme is, therefore, ongoing. Her prayer number two was: furthermore, could there be clarification as to whether the project prioritises grid extension or service connections for the beneficiaries, and what timelines are in place for its roll-out?
Animals from Ajai Forest Reserve in Madi-Okollo keep crossing into Vurra, destroying crops and hurting people. A member asks the minister to inspect the area and build a fence to stop the problem.
Summary written by a computer
Read the full speech, word for word
Thank you very much, Mr Speaker, for this opportunity. Ajai Forest Reserve and Ajai National Game Park are in Madi-Okollo, on the border between Arua District, Vurra Constituency. Last week, animals crossed to Arua District in Vurra and destroyed a lot of crops. I am requesting the minister to go on the ground and inspect the area and also fence that line because many people of Vurra are suffering a lot. These animals always cross, destroy very many crops and it is going to cause a lot of problems. I request the minister to consider Madi-Okollo; this is Ajai Forest Reserve in West Nile. Thank you.
January 2025
A member said the budget misses the promised road from Nebbi to Goli, a key link to Zombo and Vurra. He also warned that free primary and secondary schooling is being talked about without enough funding for capitation grants or school feeding, citing Pakwach.
Summary written by a computer
Read the full speech, word for word
15904 THE NATIONAL BUDGET FRAMEWORK PAPER FOR THE FY 2025/2026 - 2029/2030 [Mr Ongiertho] border to border with tarmac. However, we have two border points within Greater Nebbi which are very essential to us. That is Goli and Padea. They are not connected. I am bringing this point specifically for Goli, because recently, when the President was in Nebbi, he promised that at least the section from Nebbi town to Goli would be looked at. We have been talking about this road from Nebbi to Goli, to Paidha, to Zombo, up to Vurra, but for this one section, which is from Nebbi town to Goli, at least the President talked about it and I would have expected that in this budget, it would be there; it is not there. Finally, speaking about the free primary and secondary education, we have been battling with the issue of capitation grants for these schools. In primary, it is about Shs 6,000 per child per term. You can imagine, we are now talking about the free primary – What are we talking about? If we are not going to be providing or increasing capitation grants to schools per child, what does it mean? We have also started talking about feeding. Members, we are also already hearing cycles about feeding in schools. What do we mean? If we are not going to be providing budgets for this, we should not be talking about this. At one point, I even told the minister that this issue of free primary and secondary education, do not cross Pakwach with it because parents have started getting used to making a little bit of contribution and for us we are seeing the results. If now we are saying it has to be free and you are not increasing capitation grant, please, we need to be serious about what we are talking about. Thank you, Mr Speaker.
A member asked Parliament to correct the road length from Nebbi to Vurra, noting it is 120 km, not 16 km, and that it is not at feasibility stage. The member also urged priority for roads, energy, flood disaster prevention, health, ICT and green building.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I thank the chairperson of the committee and I want to address myself to the following issues: Number one, I need some corrections, both in the NDP and the report. This is because one time when you were chairing this House, Mr Speaker, I raised the issue of our road at the border, which is an economic and security road. In the NDP, it is captured as 16 kilometres long, but it is 120 kilometres long, from Nebbi to Vurra. It is put as at feasibility stage, but that road is not at feasibility stage. I laid here, on the Floor of Parliament, the final engineering design for tarmacking. That needs to be corrected by NPA. Number two, I want to talk about disaster. Right now, we are quiet and are not talking about floods, but when the rains come, everywhere you will hear people talking about disaster. Therefore, let us give it priority. Therefore, my concern here is that let us give priority to energy access and roads. The roads should be both for market, economic security and tourism – in this budget. Then, on health, let us focus more on preventive measures. I think that will help us a lot. ICT is also very important. Another thing which I need to talk about is the issue of green building. Institutions such as Makerere University can have their own source of water and electricity. Even Parliament can have its own source of electricity, from renewable solar energy. Why are we paying a lot of bills, yet we would even use half of that money to put electricity here. These are the things that we need to start thinking about. Finally, on education, we need rehabilitation - (Member timed out. )
The member said roads, especially the Nebbi‑Jukia‑Vurra road, are poor and need better supervision. He also noted that districts like Obongi lack electricity and rural connectivity is a problem. He urged the government to fix these issues.
Summary written by a computer
Read the full speech, word for word
Mr Speaker, as Government, we need to address the issue of quality. These roads were done by the NRM; they are depleted within the time when the NRM is there. We need to improve on supervision for quality. We still have districts like Obongi in West Nile that do not have access to electricity. We have issues with rural connectivity; also Nebbi-Jukia-Vurra Road still has issues. We have those key issues. Therefore, as we celebrate, we want the NRM Government to take note that we will continue to support it, but these issues we have mentioned should be attended to.
2024
November 2024
The National Broadband Initiative has connected fibre optic to the DRC border at Vurra, improving customs, immigration, e‑visa and communication services at that point.
Summary written by a computer
Read the full speech, word for word
15266 THE NATIONAL TEACHERS’ BILL, 2024 provided Annex 2 gives a list of all the districts connected to the NBI. We have 146 districts, but we have so far connected 53, but the proj - ects I am going to present are going to enable connection to the rest of the districts that have not been connected, which include Kanungu. Kanungu is not yet connected. That is where I come from. I have provided a table, which summarises the various agencies and departments that have been connected- the MDAs, the local govern - ments, the city councils, the municipal coun - cils, town councils, sub-counties, universities, tertiary institutions, hospitals, and the other agencies. All these are in the annex, but here I have given a tabular presentation of the sum - mary of these agencies. b) The NBI has been extended to 10 major border points of Uganda with neighbour - ing countries with Kenya at Busia and Malaba; South Sudan at Oraba and Elegu; the Democratic Republic of Congo (DRC) at Vurra, Goli, and Mpondwe; Tanzania at Mutukula, and; Rwanda at Katuna and Mirama Hills, respectively. We have con - nected this fibre optic to the neighbouring countries so that we are able to have seam - less services at the border points facilitated by IT. These border points have been connected to enhance access to services, customs clearance, immigration and e-visa applications, and com - munication at the border points, especially with the establishment of the one-stop border points at these locations. There are 32 transmission NBI stations that have been built across the country. In addition to that, 300 Wi-Fi hotspot sites have also been implemented across the country. Madam Speaker, I have provided annex 3, which has a list of the last mile Wi-Fi sites across the country. These sites are where you can go and access the internet for free, and you are able to transact. I have a list of the various spots across the country where we have established these Wi-Fi hotspots. The NBI is also currently utilised by 21 major internet service providers to deliver their respective network traffic. The sites connected to NBI are now able to access and utilise the various e-government services such as Internet Bandwidth, Integrated Financial Management Services, Data Centre Hosting Services, Human Capital Management System, e-government Procurement System, e-passport, e-visa, Health Management Information System, Education Management Information System, the Parish Development Model Online System, Building Industry Management System, and Unified Messaging and Collaboration System, among others. Over the years, the cost of internet bandwidth has been reduced from $300 in 2014 to the current $35 per megabyte per second per month. That is the unit of measure we use. The Government, through our ministry, is committed to ensuring that the cost of the internet continues to get lower in order to create an environment where all of us can transact digitally. I am sorry the map which was sent is black and white. It should have been coloured. I apologise. It should have been coloured to show this because that map is supposed to show the current connections of the NBI - because of the black and white - I had provided one which is coloured. I do not know whether the error was in Parliament or from my office, but I will endeavour to circulate a hard copy to all Members later, which currently shows where the NBI infrastructure is and what will be covered under phase 5 and what will be covered under the UDAP project. So, I apologise; the map there cannot be helpful because everything is dark. The NBI is vital for ensuring that all regions benefit from the digital economy. Last mile connectivity, the final segment connecting the NBI to end users, is essential in achieving comprehensive access to e-government services. What the map was basically intending to show - and I will share a copy later - is that we have MINISTERIAL STATEMENT [Dr Baryomunsi]
September 2024
In Arua District, especially Vurra, health services are weak: no Health Centre IV, only II and III centres, long distance to the referral hospital, one ambulance, and transport problems. Patients suffer, and drugs are stolen by staff, worsening care for locals and cross‑border patients.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I join honourable colleagues to congratulate this committee and thank you for this opportunity. In Arua District, we have a lot of problems in our health sector especially poor service delivery at the health centres with no legal supervision. If you go on the ground, you will know that people are suffering at the health centres. In Arua District, Vurra Constituency specifically does not have a Health Centre IV. We have Health Centres II and III - Pondo Health Centre III, Logiri Health Centre III, Lazebu Health Centre III, Nyadri Health Centre III, and Ayaayah Health Centre III. The distance from Vurra to Arua City, where the Referral Hospital is, is very long yet we do not have means of transport. We have only one ambulance, which is at Arua City. From Vurra to Arua City; people are suffering. In case of an emergency, getting transport becomes a problem. Our people are suffering because Vurra borders Zombo. From Zombo border to Arua Referral Hospital is very far. On the ground, there is a problem of stealing drugs by the technical staff. The Government will send the drug but after two to three days, the drugs will be over. This means there are some technical people, who are always on the ground stealing Government drugs. We are near the DRC border, and the number of people who get the services from Uganda is big. People are always lining up to get the services.
A member asked the government to send more drugs and staff to Vurra Health Centres, upgrade Pondo Health Centre III to IV, and address health problems in Vurra.
Summary written by a computer
Read the full speech, word for word
14456 STANDING COMMITTEE REPORT I appeal to the Government to send more drugs to Vurra Health Centres, upgrade Pondo Health Centre III to Health Centre IV, and send more staff to deliver service to our people. Mr Speaker, we have many issues and so, I appeal to the ministry to go on the ground and address the health issues in Vurra. Thank you.
A member said that although the government has sent money to universities, there is a gap between central plans and reality, with poor value for money and lack of monitoring. He highlighted that secondary schools in Vurra, such as Vurra Secondary School, lack clean water and urged the government to inspect the sites.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker, for giving me this very good opportunity. I would like to join my colleagues to congratulate this committee. Education is key for everything; that is why we are here. Mr Speaker, for sure, I am very happy today. As the Government, we have sent a lot of money to universities, but if you go to the ground, you will see there are a lot of problems. There is no value for money at the universities, yet those people are always complaining that they do not receive money from the Government. If you take note, we have sent a lot of money. My only advice to our ministry is that they must be on the ground. Monitoring and supervision is very important. If you monitor the programmes and the institutions, these people will make sure they give good reports. I move around many schools and universities; you cannot get any signatures from the top people because they are always not on the ground. This means there is a very big gap between the Central Government and the universities. This is also in primary and even secondary schools. At the secondary school level, I have Vurra Secondary School, Anyavu Secondary School, Logiri Girls Secondary School, Okufura Secondary School and Arivu Secondary School. Mr Speaker, if you go there, you will notice that there is no proper clean water source at those schools. I appeal to the Government to go on the ground.
August 2024
A member said the road network, especially the Nebbi‑Goli‑Paidha‑Zombo‑Warr‑Vurra Road, needs rehabilitation to help local people travel and trade. The Parliament wants better roads to support growth in the area.
Summary written by a computer
Read the full speech, word for word
14107 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 29 AUGUST 2024 We also recognise and appreciate the decision to elevate three municipalities into cities. These are notably; Gulu, Lira, and Arua cities plus Moroto which is not yet operationalised, but it was passed. This elevation status has created immense opportunities for the region, which, if properly harnessed, will bolster the development of this area. Your Excellency, we also recognise that northern Uganda is not a homogeneous society. The different subregions within northern Uganda have peculiar realities which impact on their growth and development. However, there are cross cutting realities notably; the post war recovery, the high level of poverty and ever growing youth population a fair number of which are unemployed, a large track of arable land, averse national resources, the high influx of refugees, environmental degradation, limited transport infrastructure, heavy reliance on subsistence agriculture, limited value addition to agricultural output, retrogressive cultural practices such as cattle rustling, and the subjection of women and girl child, the enormous water resources, lack of health facilities and lack of enough schools. For instance, if you look at Gulu, Gulu City does not have a Senior five, A-level school. While we have a number of issues that affect each and every area that is; West Nile, Acholi, Lango and Karamoja. Then delayed compensation of war victims and lack of compensation for the land that was taken over during the insurgency. Your Excellency, the sitting specifically took cognisance of the need for mindset change as a major catalyst for increased production and social-economic transformation in the northern region. In addition, the House recognised the need to embrace viable cash crops, livestock agriculture, agricultural mechanisation and value addition, and sustainable organic farming, among others. The Sitting recognised the importance of reliable transport and communication infrastructure as an enabler of growth and development. To this end, Members raised the need for the rehabilitation and development of strategic national roads infrastructure in the different regions notably; Moroto-Kotido- Kaabong-Karenga Road, Koboko-Yumbe- Moyo Road, Kitgum-Kidepo Road, Nebbi- Goli-Paidha-Zombo-Warr-Vurra Road. They are very many of them plus bridges and we shall hand it over to you. Including our famous Karuma Bridge that is about to give way. Your Excellency, at the end of this Sitting, I will submit to you a memorandum detailing the specifics of the areas of concern that this House has passed, that the committees found on ground and need to be worked on in the northern region. Members noted the need to work to ensure the success of the prevailing government development initiatives such as Emyooga . The 4-acre model may not be vital in this area because we have all the land. What we need is to do mechanisation, provide some funds in societies, create market for these products, identify the cash crops to be grown in this area to have a participatory approach to what is being done in this area and have a micro- credit scheme by adapting such programmes to local realities in order to achieve meaningful outcomes in the region. Your Excellency, at the end of the Sitting, we will transmit these resolutions for your relevant action as the Chief Finance Minister of this country. All these relate to finances. Our work is to find out what is lacking but at the end of the day, it all comes back to the Chief Finance Minister who is none other than your good self. As the leadership of the Legislature, we intend to have the regional sittings as a salient aspect of our legislative culture and vision of taking Parliament to the people. We, being a people- centred Parliament, we believe in evidence- based legislation and this can ably be done by our committees who go to the ground and find out what is happening there and report back to Parliament. Your Excellency, I now take the singular honour to invite you to address the House and
A member from Vurra in Arua District thanked the speaker and introduced himself as the representative of Vurra Constituency.
Summary written by a computer
Read the full speech, word for word
Thank you, Madam Speaker. My name is Yovan Adriko, representing the people of Vurra Constituency, Arua District. Greetings from West Nile. You are welcome.
A member said the road from Nebbi through Zombo to Vurra Custom should be tarmacked first because it can bring revenue from the border and help fund other internal roads. The road is already designed but still not built.
Summary written by a computer
Read the full speech, word for word
Yes, one priority road which we need to tarmac is the road which can generate for us revenue, and that is the road from Nebbi, Goli, Paidha, Padea, Zombo, Zeu, Warr up to Vurra Custom, then Liya toward Odramacako. Because Uganda needs revenue, we need to prioritize that road which appeared in the NDP II but was left out. In the NDP III; it is not tarmacked up to now. We need to use that logic to generate money from the border in order to build the internal roads. So, that is the priority road the President talked about it recently at Hon. Nyamutoro’s function in Nebbi; let us prioritise that road. For some of these roads being mentioned, they are still doing the concept; let us grade them; that this road already has full engineering design, this one is at the concept stage, and then from there, we can prioritise because we cannot do all of them at the same time.
A member said the road from Goli to Vurra is not urgent or necessary.
Summary written by a computer
Read the full speech, word for word
Thank you, Madam Speaker. I want to give this information that much as we thank the committee for the work they did, we realised that the way they handled this particular road of Goli to Vurra depicts that the road is not as urgent and necessary in this country.
A member asked the Finance Minister to consider the economic benefits of a road from Zombo to Vurra, saying it could improve other roads in the country and offered free transport for a joint study.
Summary written by a computer
Read the full speech, word for word
14057 THE ELEVENTH PARLIAMENT OF UGANDA WEDNESDAY, 28 AUGUST 2024 We want to request and implore the minister of Finance to take interest in the economic value that this road will give to this country. We are not only talking for Zombo, but this road of Goli to Vurra can make other roads in this country. Minister of Finance, I would love to give you free transportation to go and we do this study together. Possibly you will appreciate what we, the Members of Parliament, have already appreciated. Thank you.
A member said that the road from Nebbi to Vurra to Odramacako is in bad condition, causing traffic jams and lost revenue. He urged Parliament to finish repairs urgently.
Summary written by a computer
Read the full speech, word for word
To conclude, Madam Speaker, this road has about five border points and each border point receives about 50 vehicles per day crossing to DRC. And from DRC, on average, each border point receives about 20 vehicles. Because of the bad roads, once a lorry or a truck blocks the road, that means loss of revenue for Uganda. Therefore, I implore that this must be a priority and my prayer is that this issue of the road from Nebbi to Vurra to Odramacako should be concluded tomorrow. Thank you.
A member asked Parliament to fix roads in Vurra and Upper Madi, noting broken bridges that forced a president’s airlift. He urged the ministry to prioritize these roads in the budget.
Summary written by a computer
Read the full speech, word for word
Madam Speaker, the road that time, which was pledged by the President, was the Pawor, Canya, Baribu and Vurra Road. And in 2016, the President who could not access Upper Madi, particularly Offaka Subcounty for his campaigns, he had to be airlifted because the bridges were all broken. He pledged that the Anyiribu–Offaka-Uleppi Road would be rehabilitated. All these years, I have been drawing the attention of the Minister of Finance, the Minister of Works, but nothing has been done. I pray that these roads be worked on and be prioritized in the ministry’s budget. Thank you.
April 2024
A member urged Parliament to set up a one‑stop border point in Vurra or nearby to curb porous trade between Uganda, the DRC, and South Sudan, noting that existing points are under construction or completed elsewhere.
Summary written by a computer
Read the full speech, word for word
12345 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 4 APRIL 2024 That said, I have two recommendations through you, Mr Speaker. 1. The recommendations put forward by the committee should include the entire country and areas where they did not visit, particularly West Nile. 2. We know that one-stop border points have been established. In Mpondwe and Katuna, construction is ongoing, while Elegu was completed sometime back. Through you, Mr Speaker, I would like to urge that a one-stop border point be established, if not at Lia in Adumi, in Koboko where the three countries meet. Or at least in Vurra. We will be able to reduce incidences of porous trade between these three or four countries. I beg to submit.
February 2024
A member asked the Minister of Education to update on schools for people with disabilities and then requested a statement on upgrading the road that passes through Zombo, Vurra and other towns.
Summary written by a computer
Read the full speech, word for word
On Tuesday when that issue of schools for people with disabilities is being handled, let the Minister of Education and Sports also update us on the same. Next item. MINISTERIAL STATEMENT ON THE STATUS OF UPGRADING THE NEBBI- GOLI-PAIDHA-ZOMBO-ZEU-WARR- VURRA-LIA-ODROMACAKU ROAD
The sentence that names Vurra
“Mr Speak - er, I am here to give a statement on the status of Nebbi-Goli-Paidha-Zombo-Zeu-Warr-Vurra- Lia-Odromacaku Road, which is 119 kilome - tres.”
Read the full speech, word for word
Mr Speak - er, I am here to give a statement on the status of Nebbi-Goli-Paidha-Zombo-Zeu-Warr-Vurra- Lia-Odromacaku Road, which is 119 kilome - tres. This is a national road in West Nile. It con - nects the districts of Nebbi, Zombo and Arua. The road is an important international route used to access Uganda’s borders with eastern Democratic Republic of Congo (DRC). It is important for agriculture, trade and security purposes, providing access to the border areas near DRC.
The road from Nebbi to Vurra, passing Zombo, was studied and designed for bitumen upgrade but funding is pending. UNRA keeps it passable as gravel. A bridge near Vurra is being rebuilt with new concrete culverts, expected to finish in four months.
Summary written by a computer
Read the full speech, word for word
11644 THE CIVIL AVIATION AUTHORITY (AMENDMENT) BILL, 2023 Planned interventions on the road Mr Speaker, the feasibility study and detailed design for the upgrading of the road to bituminous standard was completed in 2017. The road was included on the list of roads prioritised for upgrading in the National Development Plan (NDP) III. However, due to the limited resources available in the medium- term expenditure framework, the initiation of the road upgrading works was not commenced. Mr Speaker, the Government has made efforts to secure financing for upgrading the road. The Nebbi-Goli (19km) section of the road was submitted to the Arab Bank for Economic Development in Africa (BADEA) for funding. The preparation appraisal missions for the project are expected to be completed in the Financial Year 2023/2024. If approved by the financier, the works will commence in the Financial Year 2024/2025. The planned upgrading of Goli-Paidha-Zombo- Warr-Vurra (100km) section of the road project was submitted to the African Development Bank for inclusion in the Indicative Operation Pipeline (IOP), which includes the projects to be considered for funding in the period from 2022 to 2026. The works on the project will commence depending on confirmation of financing. The road is currently being maintained by UNRA as a gravel road under the UNRA Arua station. The Goli-Paidha-Zombo section of the road is currently maintained under a framework contract for periodic maintenance. The Zombo–Vurra–Arua section of the road is currently maintained under Force Account. Mr Speaker, in conclusion, the Nebbi-Goli– Paidha-Zombo-Warr-Vurra road is an important link and was prioritised for upgrading in the Third National Development Plan (NDP III). However, due to limited resources, the proposed upgrading of the road was deferred for implementation under future plans. The feasibility study and the detailed engineering designs for the road upgrading were completed and efforts are being made to get financing for the proposed upgrading. In the meantime, Uganda National Roads Authority (UNRA) will ensure that the road is maintained in a motorable state to ensure continued connectivity in the region. Mr Speaker, on the same note, as you had earlier guided, I would like to make an additional response to the Mpondwe Bridge. This Mpondwe Bridge is after Bwera and we had a bridge which had been made using metallic culverts but these culverts were vandalised by our own who wanted scrap. We realised it later but we did emergency works last year and currently, we have come up with the designs of the concrete box culverts, which is 30 metres long with a high fill at a contract of Shs 1.7 billion. We have our contractor who was doing other projects in the region, that is, Armpass Technical Services Ltd, that is mobilising to start on the work and within a period of four months from now, that bridge will be finished. I beg to submit. Thank you.
A member said Uganda should build tarmac roads to border posts, especially Vurra, to boost revenue. The minister noted a lack of funds, but suggested raising money from Vurra and other border posts to develop roads.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I also thank the honourable minister for the statement. like I said before, if there is any road which is having a higher return on investment, it is that road. It fits well with the policy of connecting all the border posts of Uganda to tarmac roads because we need revenue. The Minister of Finance, Planning and Economic Development here is talking about lack of funds for many things. We have an opportunity to raise money from Goli, Padea, Vurra, Lia and Odramacaku border posts and there are three other potential border areas that can be developed. MINISTERIAL STATEMENT [Mr Byamukama]
A member urged fast‑tracking a loan from the African Development Bank and BADEA to repair a road that serves West Nile’s food basket, linking Zombo, Arua, Vurra, Kiboga and Nakaseke. The road is vital for agriculture, trade, security and emergency access.
Summary written by a computer
Read the full speech, word for word
11645 THE ELEVENTH PARLIAMENT OF UGANDA TUESDAY, 6 FEBRUARY 2024 I want to give this additional information so that these stakeholders the minister mentioned - like the African Development Bank, Arab Bank for Economic Development in Africa (BADEA) based in Khartoum, and the people from Nebbi, Zombo, and Arua district or Vurra need to have a meeting to fast-track to see that we get a loan for this very important road. This area is highly - we call it actually the “food basket” for West Nile. It has a lot of coffee, the Government is promoting tea in that area; we have a lot of fruits, matooke - all these things are supplying the greater north. Related to that, we have many of the forest reserves; talk about the plantation forests. We have Lendu, Okavurero, Awang and Ossi. These are very important investments of the Government. In addition to those, we have two dams on River Nyagak. Since the road is in poor shape and the area is agro-based, it is now difficult for many people to benefit from agriculture. As a result, agriculture is not helping them. They have gone to environmental degradation and it is affecting two dams, that is, Nyagak I and Nyagak III. In fact, this is why you see Nyagak I is producing only 1.7 megawatts of electricity because of degradation. We need the road so that people can move away from environmental degradation. On the revenue side, Shs 3 billion is the estimated market in the DR Congo. With these four borders plus the three more potential borders, if they are open, we can generate a lot of money from there. Accidents on these roads are very many. Breakdown of vehicles moving on these roads is too much yet the cost of maintenance is very high. On the issue of health and emergency, the whole area does not have any referral hospital, apart from the regional referral hospital in Arua. If the road is in bad shape, how are we going to rescue our people in case of an emergency? You may recall that in 2021, when Zombo was attacked two times by bandits from the DR Congo, one of the reasons was - they tried all other alternatives but there was no market for their produce; so they were tempted to go and join those people in the DR Congo. We quelled that one because we never wanted it. But even the Uganda People’s Defence Force (UPDF) could not maintain or contain the bandits because there were no roads to cross with those machines. There are no bridges. Therefore, we need that road. This road was pledged by the President in 2010. He repeated it throughout all the elections. We have reminded him in writing and also verbally. In conclusion, the market is available if we can develop this road. From Zeu, for example, to the border of the Central African Republic, is only 750 kilometres. Imagine the market we are going to tap into in that area. Therefore, my prayer remains that we must fast track the loan with the African Development Bank, and the loan with BADEA so that we can do this very important road. The money we shall generate there will help to do internal roads in Kiboga, Nakaseke, Luwero, and other parts of Uganda. This is a very important road for the security and development of Uganda. I thank you.
January 2024
A member urged the government to tarmack the Nebbi‑Goli‑Paidha‑Zombo‑Zeu‑Warr‑Vurra‑Lia‑Odramacaku road, noting only Vurra has a tarmac link and that the road could boost revenue from the Congo market. He asked for funding updates, bridge progress, and inclusion of the Nebbi‑Vurra road as an oil route.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I rise on a matter of national importance. This is the fifth time I am talking about this issue and today, I will go ahead and lay a document. This is about the policy of linking all our revenue border posts to tarmac roads. This will help to generate a lot of revenue for Uganda, and with that money generated at the border posts, we shall be in a position to do internal roads in Uganda, even if they are of less economic value. The issue is, in my hand, I have the detailed engineering design for tarmacking Nebbi- Goli- Paidha-Zombo-Zeu-Warr-Vurra-Lia- Odramacaku road, which is on the Congo border, covering many districts in West Nile. This very road is generating a lot of money for Uganda, but none of the border posts, with the exception of Vurra, is linked to a tarmac road, yet, we have a high potential of generating money from the Congo market. Mr Speaker, you will recall that when you came to Paidha, we raised this issue and you confirmed that that area is very productive and it should have access to markets. Therefore, the feasibility study and detailed engineering design were done in March 2018 and I have been pursuing this. We are wondering why this road is not prioritised and budgeted for so that we can generate more money for this country. My prayers are: 1. That the Minister of Finance, through the Prime Minister, should update this House on the progress made in pursuing money for tarmacking this road from BADEA, the Arab bank based in Khartoum. 2. The Government should find money, in this budget, so that we can work on that road to generate more money for the country. 3. There were two bridges that were done on the road; Wariki Bridge and another in Vurra. We want the minister for works to come and update this House on why the projects stalled, yet there are seven other bridges to be done. 4. Nebbi-Vurra Road, there is a road from Panyimur to Pakwach, along the Nile, which is a tourism and security road. We pray that it be included as an oil road
A report was presented on consultancy services for feasibility and detailed engineering design of national roads, covering routes that include Zombo and Vurra.
Summary written by a computer
Read the full speech, word for word
Mr Speaker, I beg to lay this report of the consultancy services for feasibility and detailed engineering design of selected national roads, Lot 2 and Lot 4: Nebbi-Goli-Paidha-Zombo-Zeu-Warr-Vurra- Lia-Odramacaku Road. I beg to submit.
A member requested the designation of Kotido Municipality, Vurra County, Okoro County, Kajara County, Katerera County, Kyaka North County, and Kitagwenda County.
Summary written by a computer
Read the full speech, word for word
11357 THE ELEVENTH PARLIAMENT OF UGANDA TUESDAY, 9 JANUARY 2023 12. Hon. Ismail Muhammed Lomwar - Kotido Municipality; 13. Hon. Yovan Adriko - Vurra County; 14. Hon. Gabriel Okumu - Okoro County; 15. Hon. Michael Kamugisha Timuzigu - Kajara County; 16. Hon. Mohammed Kato - Katerera County; 17. Hon. Paul Asaba Nsabimana - Kyaka North County; 18. Hon. Alex Ndeezi - PWD Representative; and 19. Hon. Nuru Joseph Byamukama - Kitagwenda County. I beg to designate.
2023
June 2023
The sentence that names Vurra
“Free Wi-Fi hotspots have been established at nine border posts namely; Lwakhakha, Mpondwe, Mutukula, Busia, Vurra, Katuna and Elegu.”
Read the full speech, word for word
9123 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 15 JUNE 2023 broad-band sites have been upgraded to 3G, providing services to over 700,000 Ugandans. Free Wi-Fi hotspots have been established at nine border posts namely; Lwakhakha, Mpondwe, Mutukula – (Interjection) - no, I am still very fine. Sorry, he has interrupted me. Free Wi-Fi hotspots have been established at nine border posts namely; Lwakhakha, Mpondwe, Mutukula, Busia, Vurra, Katuna and Elegu. (Applause) Next year, Wi-Fi will be deployed to 820 locations targeting schools, hospitals and markets in selected sub-regions. The Greater Kampala Metropolitan Network will be upgraded to monitor service provision over the national backbone infrastructure. (Applause) We will also digitally transform public service delivery by connecting all essential services such as schools, hospitals, tourism sites and the police to the national backbone. Madam Speaker, an allocation of Shs 192 billion has been provided to accelerate digital transformation. (Applause) Expediting strategic initiatives The development of oil and gas, the beneficiation of minerals and investment in science innovation and research are key strategic initiatives that will significantly support that socio-economic transformation. Oil and gas The final investment decision for the development of the East African Crude Oil Pipeline was taken on 2 February 2022. We are fast-tracking the construction of the East African Crude Oil Pipeline (EACOP) and the National Oil Refinery. In addition, the right- of-way for the Kabaale (Hoima) – Buloba refined products pipeline, and the financing for the refinery and associated infrastructure will be concluded. Preparatory work for the development of a petrochemical industry at the Kabaale Petro-based Industrial Park will also be expedited. I have allocated Shs 447 billion to fast-track the development of petroleum resources next financial year. Science, Innovation and Research Madam Speaker, Government is supporting several innovation and scientific research initiatives that will propel Uganda industry into the high-technology economy. These include; 1. Vaccines research and development, including therapeutics and diagnostics to enable Uganda to enter into the pathogen economy; 2. Automotive industry technology development, and 3. Chipset and robotics manufacturing. During this year, we enhanced the salaries for scientists by Shs 508 billion. We shall continue to support scientists and innovators to undertake the process of Intellectual Property registration, train and sensitise stakeholders on Intellectual Property. We have provided Shs 257 billion to support Science, Innovation and Technology development. Mineral beneficiation In order for Uganda to reap the benefits of mineral resources, Uganda’s mineral deposits will be quantified to ascertain their value before beneficiation. We shall also operationalise the recently approved mineral legislation to regulate Artisanal and Small-Scale Miners (ASMs). For the development of minerals, an allocation of Shs 54.3 billion has been provided. Maintaining security, good governance and the rule of law Security, good governance and the rule of law are the bedrock for the success of our socio- economic interventions. In order to guarantee the security of persons and property, the capacity of security and intelligence agencies will be strengthened to address any security threats and build national defence capability.
April 2023
The sentence that names Vurra
“…ch has about five points - and if you compare the revenues generated from the customs border points of West Nile, from Goli, Paidha, Awasi, Vurra, Lia, Odramacaku up to Salia Musala, the amount of money there can double the one we are getting from Malaba.”
Read the full speech, word for word
8261 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 20 APRIL 2023 Disclaimer: The electronic version of the Official Report of the proceedings of Parliament (Hansard) is for information purposes only. A certified version of this Report can be obtained from the Office of the Clerk to Parliament. My prayer is that the customs border points, especially in West Nile, which has about five points - and if you compare the revenues generated from the customs border points of West Nile, from Goli, Paidha, Awasi, Vurra, Lia, Odramacaku up to Salia Musala, the amount of money there can double the one we are getting from Malaba. I pray that these customs border points are linked so that we can generate more revenue. On top of that, these areas have security roads which can help us create peace here and also open up the DR Congo market. The distance from Koboko - Kuluba to Central Africa Republic is only 775 kilometres. That can open up market for people. The DR Congo market is about US $3 billion. Why do we go to China to borrow from – ? (Member timed out.)
The sentence that names Vurra
“(Laugh- ter) I can see that most of you were not here and the ones who were not here are the ones saying, “Yes.” I will pick the Member for Iban - da and then the Member for Vurra – Everyone who has spoken today, first take your seat.”
Read the full speech, word for word
I will start with those who were here as we started plenary – Now some have started complaining. (Laugh- ter) I can see that most of you were not here and the ones who were not here are the ones saying, “Yes.” I will pick the Member for Iban - da and then the Member for Vurra – Everyone who has spoken today, first take your seat. After the Member for Vurra, I will pick Dr Ku- gonza, the Member for Ntungamo, Hon. Os - eku, Hon. Aleper, Hon. Katalihwa, UWOPA chairperson – Oh, UWOPA has spoken. So, I will pick Hon. Balmoyi, Hon. Otimgiw, Hon. Ogwal, the Member for Mbarara, the Member for Rukiga and then I will come back. Honourable colleagues, I am going to give you time.
The sentence that names Vurra
“In Vurra Constituency, we have 32 SACCOs.”
Read the full speech, word for word
Thank you, Mr Speaker. In Vurra Constituency, we have 32 SACCOs. Out of those, 11 groups received their money. How - ever, what I have seen on the ground is that the money never reached the true beneficiaries. They opened accounts, but when they go and check their accounts, they find that there is no money. What is the problem? If the money is there, why is it that when they go, they do not get it? This means there is something going on or maybe they have embezzled the money and are trying to dodge the beneficiaries. I request the Minister of Local Government to be serious, particularly with the local govern - ments because I have seen a challenge there. At the Central Government, we have tried our best to send money to the local governments, but those people are using tricks to embezzle this money. People are not benefiting from this programme. Thank you.
2022
September 2022
The sentence that names Vurra
“For example, in Arua District, which shares a border with DRC, there is a lot of opium smoking, particularly in Vurra Constituency.”
Read the full speech, word for word
Thank you, Mr Speaker. I support this motion. It is true that we, the current leaders, are in problems over mental illness. For example, in Arua District, which shares a border with DRC, there is a lot of opium smoking, particularly in Vurra Constituency. Last week, a man aged 60 had sex with a three-year-old boy. The cause of all this could be opium smoking. Murder cases have also increased maybe because of opium smoking. Therefore, I appeal to this Government, particularly Parliament, to come up with serious action because in West Nile, we have problems. As we speak, murder cases are increasing. Thank you, Mr Speaker.
The sentence that names Vurra
“Secondly, my people in Vurra Constituency are requesting for hoes.”
Read the full speech, word for word
Thank you, Mr Speaker. I support this motion. It is true that agriculture is the backbone of Uganda’s economy. Ninety per cent of the MPs here are farmers. What I am advising - local farmers are faced with a lot of challenges, particularly in terms of lack of capital. I will be happy if Government supports local farmers with agricultural loans. Secondly, my people in Vurra Constituency are requesting for hoes. Recently, Government gave hoes and farmers were very happy. This time, they request Government to support them – (Member timed out.)
The sentence that names Vurra
“I request our Government to do border demarcation from Vurra Custom, Logire up to Zombo because there is a lot of confusion there.”
Read the full speech, word for word
Thank you, Mr Speaker, for giving me this opportunity. The issue of the border between Uganda and the DRC is a serious one. I worked for 15 years at the border as the LC III chairperson. Currently, there are many cases of stolen vehicles, which are transported through my constituency. If you try to check the border between Uganda and the DRC, there is no road. If you went there now, you would get lost. You would think you are in the DRC and yet you are on the Uganda side. I request our Government to do border demarcation from Vurra Custom, Logire up to Zombo because there is a lot of confusion there. People claim to be land owners or landlords, but it always causes a lot of confusion. Secondly, as my colleague has said, recently, the Arua Regional Referral Hospital ambulance was stolen. We have a neighbouring district called Aru. All our vehicles are there in the DRC. Currently in the DRC – (Member timed out.)
Nothing here for the year you chose.
Named through Arua District
These passages name the larger area, so they apply to every constituency inside it.
2026
July 2026
The sentence that names Arua District
“On my own behalf and on behalf of the people of Arua District, I rise to extend my condolences to the family.”
Read the full speech, word for word
Thank you, Mr Speaker. On my own behalf and on behalf of the people of Arua District, I rise to extend my condolences to the family. Mr Speaker, I stand to pay tribute, as a daughter of a military person whom Gen. Moses Ali recruited during Amin’s time and who rose to the rank of a Colonel because he had to bring him back from exile to join the UPDF. Gen. Ali Moses is a household name in West Nile. There are younger people who have never seen him but they know that there is a father, a “cock” in West Nile called Gen. Moses Ali. Gen. Moses Ali served for many years in this country but you would never see his name riddled in scandals. He served with dedication. When you hear about corruption, you would never hear about our great father in those issues of corruption. We thank him for that. He has been a model to us and he was a humorous person. One time, when he was not well and had returned from treatment abroad, we did not go to see him as the West Nile Parliamentary Caucus. Later, we had a meeting for the caucus with the Equal Opportunities Commission and he was the first person in the room. When we arrived, he jokingly said, “You people thought I was gone. I am around. You did not come to see me, so I have brought myself”. He was a friendly person to all ages. Mr Speaker, one of the things Gen. Moses Ali stood for was connecting West Nile to the national grid. We thank the Government for that achievement. He has been looking forward to the last-mile connections. We have enough power in the West Nile, but many institutions are not connected - (Member timed out.)
The sentence that names Arua District
“I am from Arua District and our quota is merged with that for Arua City.”
Read the full speech, word for word
Thank you, Mr Speaker. I stand to second this motion because nations have bridged gaps between the poor and the middle-income earners through provision of education. Uganda has made strides by introducing Universal Secondary Education and Universal Primary Education, but access to higher institutions is limiting beneficiaries from the rural or poor communities. We know that in this country when you get two principal passes, you have actually passed A’ level. However, for the poor, even if their students get two principal passes, they cannot afford to pay for their children under the private sponsorship scheme. Mr Speaker, the tuition at universities is at about Shs 3 million per semester. We have parents who can pay for their children to attend good schools in this country, and they pay about Shs 3 million per term. These are the students who are the cream; they perform very well and are the ones admitted to universities for medicine and all that. When you see the courses for which students are admitted under the quota system, you will realise that some of these courses are not highly marketable. There will be very few people doing medicine or engineering under the quota system. Our environment for learning is different. In rural places, people are congested, and they are day scholars. However, in good schools, people attend morning and evening preps and sit for the same standard exams. If a student in this rural area can afford to get two principal passes, we pray in this motion I am seconding that the number for the quota system is increased so that those who are resilient in the rural areas can benefit from those courses. (Applause) Mr Speaker, since the cities were created, the ministry has maintained the quota for the mother districts to be shared with the cities. I am from Arua District and our quota is merged with that for Arua City. For two consecutive years in the past five years, Arua District has not been able to compete with the students in the city and we have missed out completely. We have eight slots, with Arua city. However, at times we get one or none. I think the ministry should also look into that. Therefore, I stand to second this. Let - (Member timed out.)
2025
September 2025
The sentence that names Arua District
“First of all, in the public gallery, we have children and teachers from St Kizito Ediofe Orphans Primary School, Arua District.”
Read the full speech, word for word
First of all, in the public gallery, we have children and teachers from St Kizito Ediofe Orphans Primary School, Arua District. They are represented by Hon. Osoru Mourine and Hon. Lematia John. You are most welcome, all the way from Arua. Thank you so much for coming. Hon. Avur, the chairman, is going to present this report. What we did was to upload it to the system. We will debate and approve it. We will make sure that we have the report because tomorrow, we will have another report. Let us go through this report and debate it. Yes?
The sentence that names Arua District
“Going by estimates of the Ministry of Works and Transport, the Shs 13.3 billion cost of rehabilitating a two-point road in Arua District would have constructed 4.32 kilometres at a cost of Shs 3.1 billion, while the Shs 21.4 billion cost of constructing 2.86 kilometres Fort Portal Road would have const…”
Read the full speech, word for word
I have no powers. I was going to say, who gives you the power to do this kind of thing? Going by estimates of the Ministry of Works and Transport, the Shs 13.3 billion cost of rehabilitating a two-point road in Arua District would have constructed 4.32 kilometres at a cost of Shs 3.1 billion, while the Shs 21.4 billion cost of constructing 2.86 kilometres Fort Portal Road would have constructed 6.9 kilometres at the above cost. The committee, therefore, notes that these variations in cost overruns resulted in inflated road project costs and loss of public funds. High consultancy and professional fees amounting to Shs 770.98 billion was paid during the financial year. The committee observed that at the time of designing the project proposal documents, they factored in high costs of consultancy and professional fees. The committee further observed that in the audits consolidated estimates of financial performance, the Government paid a total of Shs 770.98 billion as consultancy and professional fees across Government Ministries, Departments, and Agencies (MDAs). For example, under the Resource Enhancement and Accountability Programme (REAP) implemented by the finance ministry, the project had a total budget of Shs 72.8 billion during the financial year, out of which Shs 62 billion was funded by the Government while Shs 12 billion was by development partners. Out of the Shs 12.0 billion budgeted by development partners, Shs 7.62 billion was spent on consultancy fees alone, leaving a mere balance of Shs 4.4 billion only for implementing other project components. Comparatively, out of the Shs 60 billion received from the Government of Uganda, that is Shs 20 billion, was spent on staff salaries and related costs, leaving a balance of Shs 39.3 billion to the project itself. The committee observed that this is an obnoxious amount to be spent just on salaries. Madam Speaker, that is what the committee notes. The committee recommendations are there for all to read. Madam Speaker, that sums up the presentation of projects, units, and one of our recommendations is that projects be rationalised under RAPEX to go into the main ministries, other than the so-called consultants. What hurts is that irrespective of the huge fees, no single project in Uganda is on schedule. Then, we also noted something small which I will not read. You find one project officer controlling trillions of shillings in three different projects; multitasking and some of these officers are in the Ministry of Finance, Planning and Economic Development. We found one under the private sector coordinating three huge projects; one gentleman, and these things hurt the country. Madam Speaker, for the second part of the audit on ministries –
May 2025
A member listed population figures for many Ugandan districts, including Nansana, Abim, Adjumani, Alebtong, Amolatar, Amudat, Amuru, Apac, Arua, Budaka, and Bududa.
Summary written by a computer
Read the full speech, word for word
Vot Dcnljtloa tmillUOxOOO| 7L7 Kumi Municipal Council 10,187,986 7L8 Lttffi^ Municipal Council 9.351.388 7L9 Makindve.Ssabambo MuniciDat Council 15,#o,7L6 720 Masindi Municipaf Council 12,665.581 721 Mityana Mtrnicipal Council 12.658.962 722 Moroto Municipal Council 6,850,672 723 Mubende Municipd Council 12957.3L7 724 Mukono Municipal Council 24.'LO.782 725 Nansana MuniciDal Council 27.496.367 726 Nebbi Municipal Council 6.115.006 727 Nieru Municipal Council 15.34L.297 728 Ntunsamo Municipal Council 6.592.735 729 Rukuruiri Municipal Council 12,562.835 730 Sheema Municipal Council 16.140.486 731 Tororo Municipal Council 11.941.028 801 Abim District 24,678,573 802 Adjumani District 38.784.017 803 Asago District 33.692.572 804 Alebtong District 25,987.41O 805 Amolatar District 23.785.271 806 Amudat Distriet 13.077.618 807 Amuria Distric't 27,488,129 808 Amuru District 22.202.541 809 Apac District 26.403.359 810 Arua District 19,164,690 811 Budaka District 30.600.919 8L2 Bududa District 34.758.340 813 BuEiri District 38,222,8L5 814 Bugreri District 23,784,357 District 1 D \$ F ,r =
Parliament listed many municipal councils and districts with their allocated amounts, showing how funds are distributed across places like Kira, Nansana, and several districts.
Summary written by a computer
Read the full speech, word for word
Votc Dcfclpt*rr Anrurd |UGXOOO'| 706 Ibanda Municioal Council L.232.L52 707 Iganm MuniciDat Council 497.83L 708 IGbale Municioal Council 2.413.306 709 IGmuli Municiod Council 1.508.152 I(aochomra MuniciDal Council 1.140.129 7LO 7tt Iksese Municioal Council 923.66L 7L2 Kira MuniciDal Council 8.168.523 7t3 Kisoro Municipal Council L.232.446 714 Kitsun Municioal Council r.040.555 715 Ibboko Municipal Council 1.349.879 716 I(otido Municipal Council 596.380 717 Kumi Municipal Council 1.059.786 7t8 LvcE.zj Municipal Council t.075.923 7L9 Malcindve-Ssabagabo Municipal Council 15.639.553 720 Masindi MuniciDal Council 1.848.406 72L Mitvana MuniciDat Council L.840.299 722 Moroto Municipal Council 468.386 723 Mubende Municipal Council 1.990.O70 724 Mukono Municipal Council 10.464.554 725 Nansana MuniciDal Council 9.753.903 726 Nebbi MuniciDat Council 460.063 727 Nienr Municipal Council r.516.439 728 Ntunsamo Municipal Council 684.105 729 RukunEiri MuniciDal Council 1.403.150 730 Sheema Municipal Council 1.903.114 73L Tororo Municioal Council 726.683 801 Abim District 2.350.879 802 Adiumani District 2.901.938 803 AEaso District 5.t49.726 804 Alebtonc District 3.305.496 805 Amotratar Distrist 2.952.94L 806 Amudat District 2,53t.739 807 Amuria District ,,_-}{R 4.131.956 808 Amuru District k-nT/ 3,261,950 809 Apac District \ <) r*s 2,876,L67 810 Arua District /, (tffif ,a /V 2,6TL,ssT 811 [ 3.ses.2sz Budaka District /v) ru \gr7 8t2 l/\./ \tfll Bududa District ^a. 4.20L.546 Yt s 55 lPage ,ft €= ] r I
April 2025
The sentence that names Arua District
“I come from a district bordering a neighbouring country; we normally budget for Arua District and I know that includes other districts that border other countries.”
Read the full speech, word for word
Thank you, Mr Speaker. I would like to thank the committee for the recommendation for a policy on how foreigners can get treatment or medical attention in our country. I come from a district bordering a neighbouring country; we normally budget for Arua District and I know that includes other districts that border other countries. And with the porous borders that we have, when we get drugs, our neighbours, especially from the DRC, for my case, get this information. The population increases and within a week or two, the medication is done. So for me, that is a big point to note. We need a clear policy on how foreigners can get medication within our country. I want to concur with the committee on issues of equipment. We have been making some progress in improving health services in the country. In my district, we finally had a health centre III upgraded into health centre IV. There were some infrastructure developments done but there is no equipment and the staffing is limited. We now have a health centre IV, that is Bondo health centre IV. It is supposed to have 87 staff but we currently have only 18. I think that is something we should take note of so that we can make sense because we need the chain to the end so that the last person can receive treatment. Finally, on the issue of the USAID funding, the committee has recommended that the Government should absorb some of these activities that were funded under that project. That is important because I know under USAID funding, there were staff that were paid in the health centres or hospitals. Now that this money is not there, we cannot be here sitting without filling that gap. That will mean some staff will not be working and it is going to create a big gap in the country.
March 2025
The sentence that names Arua District
“I rise on matters of boundary conflict between Arua District, Madi-Okollo District, Terego District and Arua City.”
Read the full speech, word for word
Thank you, Mr Speaker. I rise on matters of boundary conflict between Arua District, Madi-Okollo District, Terego District and Arua City. It seems no proper demarcation on the boundaries was done after the creation of the districts and city. Rt Hon. Prime Minister, my request is that you send the Minister for Lands, Housing and Urban Development to intervene and make proper demarcations on the district boundaries to avoid conflicts among the people. I beg to submit.
A member said the Alaa River burst, cutting off a health centre, market and the subcounty in Vurra. He asked ministries to visit and help.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. Allow me to join my colleagues in congratulating you on behalf of the people of Vurra constituency, Arua district. I have one matter of national importance. Alaa River which connects Obaru, Ombokoro and Nyirivu villages in the Ajia subcounty, Vurra County, Arua District burst and cut off a health centre III, Ajia market and Ajia subcounty. My prayer is that the responsible ministries should kindly consider visiting the area for an assessment and intervene in this matter. I beg to submit.
The sentence that names Arua district
“If it is a national road, we shall send our team on the ground and if it is a district road, we shall work together with the Arua district team to guide them on how to quickly intervene in the problem.”
Read the full speech, word for word
Thank you, Mr Speaker. I will consult the honourable colleague to be specific on whether it is a national or district road. If it is a national road, we shall send our team on the ground and if it is a district road, we shall work together with the Arua district team to guide them on how to quickly intervene in the problem. Thank you.
February 2025
Animals from Ajai Forest Reserve in Madi-Okollo keep crossing into Vurra, destroying crops and hurting people. A member asks the minister to inspect the area and build a fence to stop the problem.
Summary written by a computer
Read the full speech, word for word
Thank you very much, Mr Speaker, for this opportunity. Ajai Forest Reserve and Ajai National Game Park are in Madi-Okollo, on the border between Arua District, Vurra Constituency. Last week, animals crossed to Arua District in Vurra and destroyed a lot of crops. I am requesting the minister to go on the ground and inspect the area and also fence that line because many people of Vurra are suffering a lot. These animals always cross, destroy very many crops and it is going to cause a lot of problems. I request the minister to consider Madi-Okollo; this is Ajai Forest Reserve in West Nile. Thank you.
January 2025
The sentence that names Arua District
“I am from one of the remnant districts, that is Arua District.”
Read the full speech, word for word
Thank you, Mr Speaker. The committee reported that we continue to pay commitment fees on loans that we borrow. From the time we joined this Parliament, especially us the first-timers, this has been reported, and the question that has been asked i: “Why do we borrow when we are not ready to utilise the money?” Instead, we are continuing to spend on some monies that we have borrowed. I think the Minister will explain to us why this is happening and why it is continuing to happen. I am from one of the remnant districts, that is Arua District. Until now, my headquarters staff are sitting at the city centre. Last year, the Government allocated a small amount of money to the remnant districts. We started putting some foundation and latrines to see that we could move. However, this financial year – the logic was that they are giving some small money and they will continue adding some money every financial year but this time around, there is no allocation for the remnant districts. The people of Arua District cannot continue to move far to the city to access services. Therefore, let the ministry take priority on this so that money is allocated for the remnant districts to help them move to their location. I think there is a correlation between the fact that the commercial banks are not giving enough money to the private sector; and the private sector is affected by the domestic arrears. I think there is a correlation there. That means internally, we are killing our private sector. It is reported here that the amounts that the commercial banks give to our business people are reducing. It is because our local business persons are affected by the domestic arrears that they are not getting. If we cannot balance that, then we are going to kill the local businesses that we have in this country. I urge the ministry to have coordinated budgeting. We have stalled projects. These universities – let me give an example of universities – have projects that started 10 years ago, probably they are on the first floor or second floor, but we go ahead to allocate new structures to other institutions without finishing or completing the ongoing ones as if we do not have a record of where we started and where we are going. If we cannot fast-track and have coordinated planning, we are just deceiving ourselves. For 10 years, a structure is there and you are allocating money to start new structures? Also roads, Mr Speaker, we have been crying here as West-Nilers on our road. The road between Pakwach and Nebbi was supposed to be constructed within two years. It is almost four years. Now Nebbi-Arua; we are here crying over it when that stretch is not yet even completed yet we are jumping to allocate for other roads when these are not completed. Let us have coordinated planning and, I think that way, we shall have quality delivery and have the trust of the people in us who are appropriating. Thank you.
The sentence that names Arua District
“Business-owners in Arua, Koboko, Yumbe and Moyo have expressed their frustration over the continuous robbery of their goods in a village called Enzeva, in Arua District along the Kampala-Nebbi Road.”
Read the full speech, word for word
Thank you very much, Mr Speaker, for giving me the opportunity. I rise on a matter of national importance. Business-owners in Arua, Koboko, Yumbe and Moyo have expressed their frustration over the continuous robbery of their goods in a village called Enzeva, in Arua District along the Kampala-Nebbi Road. Usually, the buses and lorries carrying people and goods along this highway are waylaid by robbers wielding guns, arrows, pangas, and so on. They normally take advantage of the darkness, the steep climb, and the potholed section of the road at Enzeva. As the vehicles slow down, they are waylaid, and all the goods are taken. Our prayers, Mr Speaker: May I request the police to have routine security patrols? Secondly, may the police also set up a station at that black spot? Thirdly, the minister of works is here; may that section of the road be worked on so that the vehicles move smoothly. Thank you very much.
2024
September 2024
A member asked Parliament to reinstate the wage bill for Madi‑Okollo District, a new district split from Arua. The district has had its wage bill allocated for three years, but recruitment is delayed because the Ministry of Finance keeps postponing clearance for the District Service Commission.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker, for giving me the opportunity to speak about the people of Lower Madi. The issue I would like to raise as a matter of national importance is about the reinstatement of the wage bill for Madi-Okollo District. Madi- Okollo is a new district, which was carved out of Arua District. When we came out, Arua gave us staff to start with. For the past three years, consecutively, the wage bill has been allocated by the Ministry of Finance, Planning and Economic Development for Madi-Okollo District. However, every time the District Service Commission would wish to advertise to recruit people for different positions, three things happen: One, the Ministry of Finance, Planning and Economic Development always delays clearing the District Service Commission for recruitment. THE CONSTITUTIONAL (AMENDMENT ) BILL, 2024
In Arua District, especially Vurra, health services are weak: no Health Centre IV, only II and III centres, long distance to the referral hospital, one ambulance, and transport problems. Patients suffer, and drugs are stolen by staff, worsening care for locals and cross‑border patients.
Summary written by a computer
Read the full speech, word for word
Thank you, Mr Speaker. I join honourable colleagues to congratulate this committee and thank you for this opportunity. In Arua District, we have a lot of problems in our health sector especially poor service delivery at the health centres with no legal supervision. If you go on the ground, you will know that people are suffering at the health centres. In Arua District, Vurra Constituency specifically does not have a Health Centre IV. We have Health Centres II and III - Pondo Health Centre III, Logiri Health Centre III, Lazebu Health Centre III, Nyadri Health Centre III, and Ayaayah Health Centre III. The distance from Vurra to Arua City, where the Referral Hospital is, is very long yet we do not have means of transport. We have only one ambulance, which is at Arua City. From Vurra to Arua City; people are suffering. In case of an emergency, getting transport becomes a problem. Our people are suffering because Vurra borders Zombo. From Zombo border to Arua Referral Hospital is very far. On the ground, there is a problem of stealing drugs by the technical staff. The Government will send the drug but after two to three days, the drugs will be over. This means there are some technical people, who are always on the ground stealing Government drugs. We are near the DRC border, and the number of people who get the services from Uganda is big. People are always lining up to get the services.
A committee visited the West Nile Subregion, noting that at Muni University in Arua district two key buildings are unfinished. The Health Science Laboratory is only 67% done, and the Administration Block is 55.5% complete, with delays caused by COVID‑19 and a revised deadline.
Summary written by a computer
Read the full speech, word for word
Background - I think that one is highlighted. We can skip that. Okay, we can go to: 1.0 Findings, Observations, and Recommendations 1.1 West Nile Subregion. In the West Nile Subregion of Northern Uganda, the committee visited districts of Pakwach, Nebbi, Madi-Okollo, and Arua districts, and inspected the following institutions and schools. 1.1.1 Muni University in the Arua district Muni University is one of the public universities in Uganda, which was established by the Uganda Government by Statutory Instrument No. 31, 2013, in accordance with the University’s and other Tertiary Institutions Act. The university has an established governance structure comprising a fully-fledged council, Senate, and Committees to run its affairs. Mr Speaker, let us go to the findings because most people are eagerly waiting for the findings. But before findings, I think we should also look at the observations. In Arua or Muni University, there are two buildings that have stalled for so many years. One of them is the delayed completion of the Health Science Laboratory building and administration block. The committee observed that the contract for the completion of the construction of the Health Science Lab Building was signed between Muni University and Kisinga Construction Company Limited on the l3th March 2019. The ground-breaking ceremony and site handover were done on 25 March 2019, and the actual work started on 3 May 2019 but due to the COVID-19 pandemic, the implementation of the project was delayed and thus construction elapsed on 25 March 2022. However, the completion date was later revised by two years up to 24 March 2024 but this was not attained, and yet the work executed is only at 67 per cent. The Administration Block Annex: the committee observed that this construction project commenced on 11 April 2022 and is expected to be completed on 11 October 2024 and yet the work executed is just at 55.5 per cent. The committee observed that the capacity building centre facility has some structural problems requiring immediate attention like
The sentence that names Arua District
“Mr Speaker, during the days I was the Chairman for Athletics in Arua District as well as the”
Read the full speech, word for word
Thank you, Mr Speaker, for giving me the opportunity. On behalf of the people of Moyo District, I extend my sincere condolences to the bereaved family members, relatives, friends and the people of Bukwo, Uganda, Members of Parliament and everybody on the demise of Sergeant Rebecca. We always say that “God gives and God takes”. Mr Speaker, during the days I was the Chairman for Athletics in Arua District as well as the
The sentence that names Arua District
“14267 THE ELEVENTH PARLIAMENT OF UGANDA TUESDAY, 17 SEPTEMBER 2024 Federation of Uganda Football Association (FUFA) delegate for Arua District, during Lawrence Mulindwa’s regime, Sgt Rebecca would come with her peers to West Nile.”
Read the full speech, word for word
14267 THE ELEVENTH PARLIAMENT OF UGANDA TUESDAY, 17 SEPTEMBER 2024 Federation of Uganda Football Association (FUFA) delegate for Arua District, during Lawrence Mulindwa’s regime, Sgt Rebecca would come with her peers to West Nile. Since I was the chairperson for athletics in Arua, I would always receive them, take them around and they would participate in what we called “Mayank Race”. Mayank comprises districts from West Nile. She would come and we would train them and, at times, we would also pay a visit to Kapchorwa. That is how we always interacted. Honourable minister, this is for your attention. As I speak, I have a daughter called Margaret Ejoria Aza. She has qualified to go to one of the European countries next month - her accolades are here. I hope she is going to be protected. (Applause) She is called Margaret Ejoria Aza. She is going to one of those European countries - like father, like son - (Laughter) - like father, like daughter. (Laughter) Thank you. I also have a son who is a goalkeeper, anyway. Lastly, I would like to bring this to the attention of the House. Number one, we should develop our athletics potential by using our land, not taking our runners to go and train in Tanzania, Kenya or South Sudan. We have undulating hills and lowlands where they can train from. Number two, as said by the minister, we should avoid gender-based violence in all areas of life. Mr Speaker, here was the idea of constructing 18 stadia in the country. How far has that programme gone, honourable minister? I understand Celecelea Stadium in Moyo District is one of them. Also, Barifa Stadium, in the name of Dorcus Inzikuru, is supposed to be constructed. Otherwise, I would like to congratulate and thank the Uganda Cranes, who are doing us proud. Let us pray for them and encourage them so that they qualify for the Africa Cup of Nations (AFCON) in Morocco. However, it is important to note that as I talk, there is bickering, confusion and quarrelling in the netball fraternity. What is happening there? Minister, help in that regard. Otherwise, to all of us, let us take to sports so that we become healthy, and avoid non- communicable diseases – cardiovascular diseases and diseases that affect us such as diabetes, stroke, cardiac arrest, hypertension, high blood pressure and so forth. Thank you.
The sentence that names Arua District
“Someone mentioned Dorcus Inzikuru, one of the champions from Arua District.”
Read the full speech, word for word
Thank you, Mr Speaker. I join my honourable colleagues to pay tribute to the late Sgt Rebecca Cheptegei. This was a champion, who still had more time to shine and bring glory to this Country. It is unfortunate that at times falling in love can lead to such a bad end. For us women fall in love with our hearts and souls. At times Men probably fall in love with their heads and start calculating so many things. I would like to thank the minister who has started talking to the athletes. Most of these athletes start who are succeeding earn money at an early stage. But most of their managers focus on training but not on financial management. Someone mentioned Dorcus Inzikuru, one of the champions from Arua District. When Dorcus Inzikuru started winning, she was so young at that time and had a lot of money. People complain when they see where she was and what she is doing now but it is not only her. We have had our champions in sports shining only when they have the medals at hand. But when time goes, they are nowhere to be seen. When we started talking of the Akii-Bua when you trace their homes, what they have and yet at time T they were shining and having a lot of monies. Therefore, honourable minister, I am very happy you said are that you are taking this on… ( Member timed out. )
August 2024
The sentence that names Arua District
“Mr Speaker, we discovered that in Arua District there is only one head of department, substantially appointed, and is due for retirement next month.”
Read the full speech, word for word
14220 SECTORAL COMMITTEE REPORT Mr Speaker, the committee also noted cases where jobs that should have been internally advertised were advertised externally, neglecting the existing experienced staff. Some job adverts even failed to list job experience or some important qualifications as a requirement for job positions, even at senior level. In some cases, key documents like independent score sheets were missing from their recruitment files during the committee’s interview. Mr Speaker, a general concern was noted, that local governments deliberately keep positions vacant and ring-fenced for years until their preferred candidates meet the qualifications. The committee recommends the following; (i) The Minister of Public Service should ensure that members of the District and City Service Commission implicated in corruption tendencies and investigation by anti-corruption agencies should step aside until such investigations are concluded to preserve the integrity of the Commission and to prevent inter-meddling in evidence. (ii) The police Criminal Investigations Directorate (CIDs), in liaison with the Public Service Commission, should investigate the appointments that have been highlighted in the report with a view to possible prosecution. Mr Speaker, we have attached and referred several of these matters to the police and we appeal to Parliament to ensure as recommended. (iii) The committee acknowledges that being a child or a relative of a civil servant or politician should not be a barrier to employment. However, all applicants should have equal employment opportunities based on merit. (iv) The investigation by the Inspectorate of General Government (IGG) and other anti- corruption agencies should be concluded and pending reports should be released. Mr Speaker, we realised that in many districts, there are several investigations that have taken so long. Therefore, all the processes get affected. Mr Speaker, on 3(2) factors affecting staffing in the district and cities. The committee noted the following. Failure to attract staffing in key positions. There were difficulties in filling critical roles like the district health officers and district engineers due to low wages and high qualification requirements. For example, districts like Kole and Bukwo struggled to retain staff in hard-to-reach areas. The committee recommends the following: i. The Ministry of Public Service working with professional bodies should review the requirements for recruitment of critical positions such as district engineers, with a view to addressing the challenge of failure to attract registered engineers at the local government level. This will address the gap where currently, there are only 25 substantially appointed district engineers across the entire country. The rest are all acting. There should be special consideration for hard-to-reach areas. On long-acting periods and delayed promotions, Mr Speaker, staff often remain in acting positions and on assignment beyond the period mandated under the law and also face delays in the promotion. There are local governments that have not had substantive staff for many years and local governments have no heads of department. Mr Speaker, we discovered that in Arua District there is only one head of department, substantially appointed, and is due for retirement next month. The rest have been acting. The committee recommends that local governments should, subject to the relevant laws and guidelines, enable accelerated promotion for qualified and deserving staff, especially those that have been in acting capacity and assignment for long.
The sentence that names Arua District
“My name is Yovan Adriko, MP for Vuura Constituency, Arua District.”
Read the full speech, word for word
Thank you very much, Your Excellency. My name is Yovan Adriko, MP for Vuura Constituency, Arua District. In Lugbara, we say: “ Were were.” Thank you.
The sentence that names Arua District
“My name is Paparu Lillian Obiale, the Woman Member of Parliament for Arua District.”
Read the full speech, word for word
Thank you, Madam Speaker. My name is Paparu Lillian Obiale, the Woman Member of Parliament for Arua District.
A member from Vurra in Arua District thanked the speaker and introduced himself as the representative of Vurra Constituency.
Summary written by a computer
Read the full speech, word for word
Thank you, Madam Speaker. My name is Yovan Adriko, representing the people of Vurra Constituency, Arua District. Greetings from West Nile. You are welcome.
May 2024
Parliament listed money allocations for many local councils and districts, including Kira, Nansana, Abim, Amolatar, Amudat, Amuria, Amuru, Arua and Budaka.
Summary written by a computer
Read the full speech, word for word
.+_ lA*' "' - #+- I dI,\ h 24 . - l B l X Amount (OOO'| Descrlption Vote 635 o23 I Munici al Council 707 2,t84 771 Council Kabale Munici 704 2 238 353 709 Kamuli Munici al Council 801 696 Ka chorwa Munici al Council 7ro 3 374 618 7tt Council Kasese Munici 8 4tt 400 Kira Munici al Council 7t2 406 243 713 Council Kisoro Munici 2 331 982 Council Munici Ki 7L4 529 160 Koboko Munici al Council 715 629 284 Kotido Munici al Council 716 807 186 Kumi Munici al Council 717 2 9t4 388 7ta Council Munici 16 o46 686 7t9 Makindye- S sabagabo MuniciPal Council 1 454 635 Council Masindi Munici 720 1 387 188 Council Munici Mi 721 744 299 Moroto Munici al Council 722 5 462,294 Mubende Munici al Council 723 6 401 99t 724 Council Mukono Munici 10 505 394 Nansana Munici al Council J zzs 311 301 \-zzo Nebbi Munici al Council 429 909 N al Council eru Munici 727 I 910 156 728 Council o Munici N 1 o59 681 Council Rukun ri Munici 729 2 851 608 Sheema Munici al Council 730 3 528 439 73t Council Tororo Munici 9 o56 849 Abim District 801 5 061 3a2 Ad umani District 802 5 086 244 District 803 3 62L o37 District AIebto 804 7 t44 543 805 Amolatar District 2 946 471 Amudat District 806 9 513,880 Amuria District 807 3 s99 449 Amuru District --808 2 394 342 District A 809 3 190 840 Arua District 810 5 310 694 Budaka District 811 -_*3-- /{* M 'l-,1.i- t,
April 2024
The sentence that names Arua District
“The day before yesterday, in Arua District, a staff of the Office of the Prime Minister (OPM), Solomon Abenika, who was riding his OPM motorbike, was knocked on the streets of Arua City and sustained three fractures in the limbs.”
Read the full speech, word for word
Yes. Thank you, Mr Speaker, for giving me chance to speak, especially in reference to your communication as regards to the accident where our colleague, Hon. Katuntu’s brother, lost his life. All of us are quite aware of the way accidents happen in this country to the extent that - some of our colleagues - met their demise through it. The day before yesterday, in Arua District, a staff of the Office of the Prime Minister (OPM), Solomon Abenika, who was riding his OPM motorbike, was knocked on the streets of Arua City and sustained three fractures in the limbs. As he was being prepared to be operated on, he breathed his last. Today, his body is in St. Philip’s and all that was due to reckless driving in Arua City. In Madi-Okollo yesterday, the chairperson for a SACCO group, George, again was knocked by a reckless driver. He also broke both his limbs and he is being prepared for an operation. You are aware that the police in their Easter message brought to the attention of this country that during Easter alone, Ugandans who lost their lives through accidents were more than 80 and there were more than 200 accidents. I am bringing this in reference to your communication because it is the proper time for us to review the traffic laws in this country. I do remember that Rwanda revised the speed limit within the city, bringing it down from 120 to 80 km per hour and that will reduce the accident rates in this country to 60. My appeal through you, Mr Speaker, is that this Parliament considers reviewing the speed limit for different vehicles on the streets of this city, leaving alone even the motorbikes that are rampantly killing us. If it pleases you and more so on the side of Government, it is time for us to review, move forward and then we see over time how that can impact on the accidents. Finally, this is related to the road infrastructure that we have in this country. My Madi-Okollo is a village road. We just received Shs 500 million for the Road Fund, which you presided over that every constituency should receive. However, accidents are still happening across the constituencies in the villages. People are dying. Maybe through you, the minister can expedite the process of releasing more Shs 500 million so that we are in line with reducing the road carnage throughout the country. Thank you.
The sentence that names Arua District
“The district is bordered by the Democratic Republic of Congo to the south and west, Nebbi District to the east and Arua District to the north.”
Read the full speech, word for word
a 1.O INTRODUCTION On 21st May 2023, Zombo Tea Nursery Operators and Farmers' Association petitioned the Rt. Hon Speaker of Parliament about delayed supply of tea seedlings to farmers in Zombo district. In accordance with Rule 3O (6) of the Rules of Procedure of Parliament, the Rt. Hon Speaker referred the Petition (Annex U to the Committee on Agriculture, Animal Industry and Fisheries for consideration. 2.O BACKGROUND 2.L ZOMBO DISTRICT Zombo District is located in West Nile sub-region of Uganda in the north- western part of the country. It is approximately 70km south of Arua city and 382km north-west of Kampala. The district is bordered by the Democratic Republic of Congo to the south and west, Nebbi District to the east and Arua District to the north. Zombo District sits on a total land size of 939.7km2 of which 91olo is arable land, 5o/o dte. swamps and running water rvhile 4o/o are forests and forest reserves. The district is generally hilly and steep with its highest peak being Agu Hill in Abanga Sub-County. This has forced the population to cultivate hillsides at times without good soil management practices. The district has favourable soils for agriculture (red and loamy soils, dark loamy soils) (UDC, 2O2Il that have contributed to the steady and reliable supply of foodstuffs like lrish potatoes, maize, cassava, vegetables like tomatoes and onions across the district. Zombo has a bi-modal rainfall pattern, with peaks in April and August. Due to its altitude (1,532 metres above sea level), the tropical climate borders $ a a perate climate I tuil t=..5E\: -= # 1 illt,tft
February 2024
A member urged fast‑tracking a loan from the African Development Bank and BADEA to repair a road that serves West Nile’s food basket, linking Zombo, Arua, Vurra, Kiboga and Nakaseke. The road is vital for agriculture, trade, security and emergency access.
Summary written by a computer
Read the full speech, word for word
11645 THE ELEVENTH PARLIAMENT OF UGANDA TUESDAY, 6 FEBRUARY 2024 I want to give this additional information so that these stakeholders the minister mentioned - like the African Development Bank, Arab Bank for Economic Development in Africa (BADEA) based in Khartoum, and the people from Nebbi, Zombo, and Arua district or Vurra need to have a meeting to fast-track to see that we get a loan for this very important road. This area is highly - we call it actually the “food basket” for West Nile. It has a lot of coffee, the Government is promoting tea in that area; we have a lot of fruits, matooke - all these things are supplying the greater north. Related to that, we have many of the forest reserves; talk about the plantation forests. We have Lendu, Okavurero, Awang and Ossi. These are very important investments of the Government. In addition to those, we have two dams on River Nyagak. Since the road is in poor shape and the area is agro-based, it is now difficult for many people to benefit from agriculture. As a result, agriculture is not helping them. They have gone to environmental degradation and it is affecting two dams, that is, Nyagak I and Nyagak III. In fact, this is why you see Nyagak I is producing only 1.7 megawatts of electricity because of degradation. We need the road so that people can move away from environmental degradation. On the revenue side, Shs 3 billion is the estimated market in the DR Congo. With these four borders plus the three more potential borders, if they are open, we can generate a lot of money from there. Accidents on these roads are very many. Breakdown of vehicles moving on these roads is too much yet the cost of maintenance is very high. On the issue of health and emergency, the whole area does not have any referral hospital, apart from the regional referral hospital in Arua. If the road is in bad shape, how are we going to rescue our people in case of an emergency? You may recall that in 2021, when Zombo was attacked two times by bandits from the DR Congo, one of the reasons was - they tried all other alternatives but there was no market for their produce; so they were tempted to go and join those people in the DR Congo. We quelled that one because we never wanted it. But even the Uganda People’s Defence Force (UPDF) could not maintain or contain the bandits because there were no roads to cross with those machines. There are no bridges. Therefore, we need that road. This road was pledged by the President in 2010. He repeated it throughout all the elections. We have reminded him in writing and also verbally. In conclusion, the market is available if we can develop this road. From Zeu, for example, to the border of the Central African Republic, is only 750 kilometres. Imagine the market we are going to tap into in that area. Therefore, my prayer remains that we must fast track the loan with the African Development Bank, and the loan with BADEA so that we can do this very important road. The money we shall generate there will help to do internal roads in Kiboga, Nakaseke, Luwero, and other parts of Uganda. This is a very important road for the security and development of Uganda. I thank you.
The sentence that names Arua District
“For example, I thank our Government Chief Whip for giving out tractors, but Arua District never received any and people are now on my neck.”
Read the full speech, word for word
Thank you, Mr Speaker. Allow me to congratulate this committee and appreciate them on the issues of Karamoja. Karamoja and the West Nile are, indeed, the poorest areas, where people are suffering and the Government is trying its level best to support them. For sure, the Government has done its part. What you have seen on the ground is a lack of sensitisation by the local leaders. If we are serious leaders on the ground, like the MPs are doing to sensitise the community about the danger of these problems, for sure, we can defeat the issues which are affecting Karamoja and West Nile. For example, I thank our Government Chief Whip for giving out tractors, but Arua District never received any and people are now on my neck. I got a message from my colleague, who did not receive it as well. I asked myself where the tractors were because if everything the Government gave to the community had reached, they would be used. I would like to request that we follow up on these tractors so that we can give the information to the community.
2023
November 2023
The sentence that names Arua District
“Last year, in Arivu Subcounty, Arua District, a shopkeeper was shot by an enforcement officer.”
Read the full speech, word for word
Mama, I will wait for further guidance; a proper one. Thank you. Madam Speaker, I rise on a matter of urgent national importance. We have been complaining about the high-handedness of the enforcement team of the Uganda Revenue Authority (URA) in enforcing tax collections in West Nile. As we speak, a 73-year-old lady, Ondoru Margaret, the body has been in Arua Regional Referral Hospital Mortuary since Tuesday. Chandiru Beatrice, 43 and Patrick Biliya, 27 years were injured as a result of being knocked down in the unfortunate incident as the enforcement team were subduing smugglers. Four days ago, on 11 November 2023, in Koboko, a 22-year-old boy was shot dead after the enforcement team asked him for Shs 600,000. He gave them Shs 400,000, but they wanted the motorcycle too and, in the scuffle, they shot him. Last year, in Arivu Subcounty, Arua District, a shopkeeper was shot by an enforcement officer.
October 2023
The sentence that names Arua District
“Ayivu County formerly, under Arua District has lost all the equipment.”
Read the full speech, word for word
Thank you very much, Mr Speaker. I join others in thanking the minister for the statement. While honourable colleagues from other districts are talking about the difficulties of taking their equipment to be serviced at the regional workshops, Arua City has no equipment to be taken to Gulu, the regional centre. Arua City was formed by joining Ayivu County, which is now Ayivu Division with the former Arua Municipality. Ayivu County formerly, under Arua District has lost all the equipment. It has three road equipment units. Since Arua City does not have any equipment, what do we taken to Gulu for repair in the regional workshop? I would like to ask the Minister of Works and Transport and the Minister of Local Government to think about these cities that were created; otherwise, the money allocated ends up lying idle. The Uganda Road Fund budget for the Financial Year 2021/2022 – which the city received – Shs 600 million – was not utilised because there was no equipment to do the work. In fact, we are still investing where the money went. Mr Speaker, we hired equipment to work on roads in the Financial Year 2022/2023. I would like to implore the ministries concerned to see to it that the cities which were created have equipment. Thank you. MR MOSES ALEPER (NRM, Chekwii (Kadam), Nakapiripirit): Thank you, Mr Speaker. I would like to look at the study that the ministry carried out. When you start giving districts Shs 140-plus billion yet the workshops require Shs 100 billion – a see-saw. Is it this very money that caused the study to come to that figure? What I am saying is that while we are trying to improve things on one side, things go down on the other side. Most importantly, I would like to implore the Government on the effect when these workshops are not functional. The effect is that it will affect the productive sector in the country because the roads and the equipment are not worked on. This, therefore, undermines – the fact that we want to create economic growth and productivity in this country – That is what we definitely have to look out for. The Government must look into this matter seriously if we are to talk about economic growth, job creation, improving agricultural
The sentence that names Arua District
“In honour of that person, the Arua District Council named Barifa Stadium after her and Government pledged to construct a stadium called the Dorcus Inzikuru Stadium. 18 years later, there is not a coin spent there.”
Read the full speech, word for word
Thank you very much, Mr Speaker, for the opportunity. I join my colleagues in thanking the President for leading this struggle. I also thank you and the President of FUFA. In the celebrations, I saw the spirit of togetherness and achievement after a very long struggle. I want to thank the leadership of this Parliament for providing that leadership. Mr Speaker, this Pamoja Bid is a result of the spirit of comradeship in East Africa and I want to appeal that we take this on so that next time we are able to work together as a team. Uganda alone will not be able to manage because of the infrastructural challenges that have been raised here. In 2005, a Ugandan called Dorcus Inzikuru won the 3000 meters’ steeplechase. In honour of that person, the Arua District Council named Barifa Stadium after her and Government pledged to construct a stadium called the Dorcus Inzikuru Stadium. 18 years later, there is not a coin spent there. I take this opportunity to ask the minister; what plan does your ministry have in this regard because the region has the second busiest airport in this country and it is lying idle? We are not using it. If you had constructed a stadium there, we would be able to host these games from there. By and large, I want to thank all the stakeholders for playing a dedicated and patriotic role. This shows that this country – (Member timed out. )
May 2023
The sentence that names Arua District
“…trict – Shs 22,290,290,000 49) Vote 808: Amuru District - Shs 22,428,999,000 50) Vote 809: Apac District – Shs 20,739,922,000 51) Vote 810: Arua District – Shs 16,085,370,000 52) Vote 811: Budaka District – Shs 25,157,873,000 53) Vote 812: Bududa District – Shs 26,411,933,000 54) Vote 813: Bugiri District – Shs 34,828,…”
Read the full speech, word for word
Why don’t we listen to the whole list? You said we should read the list and we are reading it. Honourable members, listen to the figures. I do not think any of these Members will take this money into their pockets. 30) Vote 720: Masindi Municipal Council – Shs 11,172,470,000 31) Vote 721: Mityana Municipal Council – Shs 10,365,633,000 32) Vote 722: Moroto Municipal Council – Shs 5,143,627,000 33) Vote 723: Mubende Municipal Council – Shs 10,465,947,000 34) Vote 724: Mukono Municipal Council – Shs 19,829,177,000 35) Vote 725: Nansana Municipal Council – Shs 24,351,761,000 36) Vote 726: Nebbi Municipal Council – Shs 6,907,898,000 37) Vote 727: Njeru Municipal Council – Shs 13,394,572,000 38) Vote 728: Ntungamo Municipal Council – Shs 4,845,867,000 39) Vote 729: Rukungiri Municipal Council – Shs 9,415,996,000 40) Vote 730: Sheema Municipal Council – Shs 14,106,079,000 41) Vote 731: Tororo Municipal Council – Shs 9,365,323,000 42) Vote 801: Abim District – Shs 18,295,895,000 43) Vote 802: Adjumani District – Shs 31,965,889,000 44) Vote 803: Agago District – Shs 31,061,514,000 45) Vote 804: Alebtong District – Shs 23,689,489,000 46) Vote 805: Amolatar District – Shs 19,357,798,000 47) Vote 806: Amudat District – Shs 10,632,904,000 48) Vote 807: Amuria District – Shs 22,290,290,000 49) Vote 808: Amuru District - Shs 22,428,999,000 50) Vote 809: Apac District – Shs 20,739,922,000 51) Vote 810: Arua District – Shs 16,085,370,000 52) Vote 811: Budaka District – Shs 25,157,873,000 53) Vote 812: Bududa District – Shs 26,411,933,000 54) Vote 813: Bugiri District – Shs 34,828,388,000 55) Vote 814: Bugweri District – Shs 19,367,086,000 56) Vote 815: Buhweju District – Shs 15,085,933,000 57) Vote 816: Buikwe District – Shs 24,383,139,000 58) Vote 817: Bukedea District – Shs 26,466,423,000 59) Vote 818: Bukomansimbi District – Shs 18,428,274,000
The sentence that names Arua District
“8755 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 18 MAY 2023 94) Vote 809: Apac District – Shs 20,739,922,000 95) Vote 810: Arua District – Shs 16,085,370,000 96) Vote 811: Budaka District – Shs 25,157,873,000 97) Vote 812: Bududa District – Shs 26,411,933,000 98) Vote 813: Bugiri District – Shs 34,828,…”
Read the full speech, word for word
8755 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 18 MAY 2023 94) Vote 809: Apac District – Shs 20,739,922,000 95) Vote 810: Arua District – Shs 16,085,370,000 96) Vote 811: Budaka District – Shs 25,157,873,000 97) Vote 812: Bududa District – Shs 26,411,933,000 98) Vote 813: Bugiri District – Shs 34,828,388,000 99) Vote 814: Bugweri District – Shs 19,367,086,000 100) Vote 815: Buhweju District – Shs 15,085,933,000 101) Vote 816: Buikwe District – Shs 24,383,139,000 102) Vote 817: Bukedea District – Shs 26,466,423,000 103) Vote 818: Bukomansimbi District – Shs 18,428,274,000 104) Vote 819: Bukwo District – Shs 22,102,420,000 105) Vote 820: Bulambuli District – Shs 22,999,426,000 106) Vote 821: Buliisa District – Shs 14,874,929,000 107) Vote 822: Bundibugyo District – Shs 33,203,487,000 108) Vote 823: Bunyangabu District - Shs 19,891,642,000 109) Vote 824: Bushenyi District – Shs 28,896,953,000 110) Votes 825: Busia District - Shs 32,967,494,000 111) Votes 826: Butaleja District - Shs 33,927,473,000 112) Vote 827: Butambala District – Shs 23,446,766,000 113) Vote 828: Butebo District - Shs 16,607,616,000 114) Vote 829: Buvuma District – Shs 13,321,617,000 115) Vote 830: Buyende District – Shs 22,651,177,000 116) Vote 831: Dokolo District – Shs 21,223,707,000 117) Vote 832: Gomba District – Shs 21,231,932,000 118) Vote 833: Gulu District – Shs 21,678,185,000 119) Vote 834: Hoima District – Shs 20,331,850,000 120) Vote 835: Ibanda District - Shs 21,754,328,000 121) Vote 836: Iganga District – Shs 38,124,629,000 122) Vote 837: Isingiro District – Shs 43,369,358,000 123) Vote 838: Jinja District - Shs 37,285,315,000 124) Vote 839: Kaabong District - Shs 16,287,466,000 125) Vote 840: Kabale District – Shs 32,609,628,000 126) Vote 841: Kabarole District - Shs 20,343,712,000 127) Vote 842: Kaberamaido District – Shs 14,913,324,000 128) Vote 843: Kagadi District - Shs 35,348,272,000
January 2023
The sentence that names Arua District
“That is Arua District; it still operates its district office headquarters within Arua City.”
Read the full speech, word for word
That is Arua District; it still operates its district office headquarters within Arua City. Now, I wonder - we upgraded these cities, in this House - I remember, the Ministry of Finance said there was money, but now there is no money. How come? I think the Ministry of Finance should be realistic. Otherwise, people are questioning us every day. They think we just wasted their time by creating these cities. We thought cities would even have more money than districts, but it is to the contrary. Ministry of Finance, can you please help us - because at the border, we collect a lot of revenue, which we send this way. Arua being in a triangular form, it shares a border with South Sudan and DRC and it sends a lot of money to the Consolidated Fund; why don’t you - I remember Parliament guided last time that the money that is collected by the local governments be spent at source, but up to now, this has not been implemented, and I want to ask why. Let them answer because we are also
2022
September 2022
The sentence that names Arua District
“For example, in Arua District, which shares a border with DRC, there is a lot of opium smoking, particularly in Vurra Constituency.”
Read the full speech, word for word
Thank you, Mr Speaker. I support this motion. It is true that we, the current leaders, are in problems over mental illness. For example, in Arua District, which shares a border with DRC, there is a lot of opium smoking, particularly in Vurra Constituency. Last week, a man aged 60 had sex with a three-year-old boy. The cause of all this could be opium smoking. Murder cases have also increased maybe because of opium smoking. Therefore, I appeal to this Government, particularly Parliament, to come up with serious action because in West Nile, we have problems. As we speak, murder cases are increasing. Thank you, Mr Speaker.
The sentence that names Arua District
“…at a cost of Shs 1.4 billion in 2018, and that this construction was supervised by engineers from the Ministry of Education and Sports, and Arua District Local Government, from 2018 to 2019.”
Read the full speech, word for word
Mr Speaker, Hon. Ronald Olema, Member of Parliament, Lower Madi Okollo County, Madi Okollo District raised an issue. He gave a long narrative. He wishes to put forward the issue of poor status of Pawor Seed Secondary School, which was constructed by the Ministry of Education and Sports at a cost of Shs 1.4 billion in 2018, and that this construction was supervised by engineers from the Ministry of Education and Sports, and Arua District Local Government, from 2018 to 2019. He further said that two different contractors, Gibo Company Ltd and Dolphins Consulting Engineers & Contractors Ltd were awarded the seed secondary school contract worth Shs 700 million each. The school, which is on the verge of collapsing due to poor and careless interior and shoddy works, is located nine kilometres away from the nearest trading centre. He indicated that on 8 September 2021, he wrote to the Ministry of Education and Sports about the poor status of the school, but to-date, the school matter has not been handed over to Madi-Okollo District Local Government by either Arua District or the Ministry of Education and Sports. He further said that during his monitoring visit to the site, together with the RDC, the district chairperson, the district councillors and the LC3 chairpersons of Madi-Okollo District, they noted that a headteacher, with a few teachers, were posted to this school and they had admitted some students who are being exposed to a death trap due to shoddy or appalling structures. Noticeable was the fact that all toilet structures had collapsed beyond repair, including four classroom blocks, the administration block and the computer room, which stand condemned for exposing students and teachers. According to him, there was no value-for-money. No assessment was done at the site, and the school could be closed by all standards. His prayer is: Can the Ministry of Education and Sports undertake an immediate assessment and major repairs done in the school before term three?
The sentence that names Arua District
“5941 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 22 SEPTEMBER 2022 Mr Speaker, my response is that the Ministry of Education and Sports has noted this anomaly and has organised a meeting between the project implementation team from Arua District and the technical team from Madi- Okollo District.”
Read the full speech, word for word
5941 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 22 SEPTEMBER 2022 Mr Speaker, my response is that the Ministry of Education and Sports has noted this anomaly and has organised a meeting between the project implementation team from Arua District and the technical team from Madi- Okollo District. The Ministry of Works and Transport has constituted a technical team too, to undertake an immediate assessment. The outcome of the above two engagements will inform the next course of action. He had an additional question: Can the Ministry of Education and Sports, together with Arua District Local Government, either consider the school condemned or handover, once major repairs are done? Mr Speaker, my response to the honourable member is that the handover will be informed by the joint structural and technical assessment report, and the outcomes of the engagement of the two district local governments; that is Arua and Madi-Okollo. He had a third additional question: Can the Ministry of Education and Sports consider additional funding for the establishment of a boarding section, since the students commute from eight kilometres away; and also provide a clean water source, that is a borehole with solar power? My response, Mr Speaker, is that all seed secondary schools are purely day and no boarding facilities are provided. Regarding the provision of a clean water source - that is a borehole - the local governments and Ministry of Water and Environment have been required to prioritise seed secondary schools in their plans for water provision. For solar power, once the operational issues are addressed, the school will be prioritised under the Electricity for Rural Transmission Project, which is within the Ministry of Education and Sports and the energy ministry. He had a fourth question: Can Government ensure that the persons involved in shoddy works, putting Government’s name to shame, be investigated and apprehended? Mr Speaker, my response is that Government of Uganda does not condone shoddy works and believes in value-for-money. Therefore, we are currently undertaking a technical assessment and the recommendations therein shall be implemented to the letter; and the culprits, if any, will be brought to book. The second Member is Hon. Christine Apolot, Kumi District Woman MP. Her prayer is that the Prime Minister informs the House on the Government undertaking to establish regional cancer centres.
The sentence that names Arua District
“In line with the above, Government is undertaking the following interventions, specifically in Arua District and Arua City: 1.”
Read the full speech, word for word
5660 THE COMPUTER MISUSE (AMENDMENT) BILL, 2022 Madam Speaker, the campaign is currently running on various media houses at national and sub-national levels. In line with the above, Government is undertaking the following interventions, specifically in Arua District and Arua City: 1. Sensitising school management to accept child mothers back into school settings, to enable them pursue their education dreams; 2. Implement a nutrition programme under the Child Sensitive Social Protection, targeting lactating and pregnant child mothers. This is intended to enable them give birth to healthy babies whom they can leave under the care of their parents and grandparents while they return to school; 3. Sensitising and encouraging households, especially grandparents and caregivers, to accept and take care of the babies of the teenage mothers to enable them return to school; 4. Strengthening the referral pathway so that child mothers are able to access education, healthcare and protection services; 5. Providing sexual and reproductive health services to child mothers, including HIV/ AIDS and sexually transmitted infections screening. 6. Promoting positive parenting among parents and caregivers, among others; and sensitising children to refrain from sexual activities at their tender age. Question 5 Madam Speaker, Question five was presented by Hon. Tumwine Anne Mary, Ntoroko District Woman Representative. She said that there is a growing concern in the Uganda Police Force recruitment and deployment in the country, which has resulted in many of them committing suicide and others becoming deserters, which puts the country at the risk of increased thuggery and killing of innocent Ugandans. The Special Police Constables (SPCs) are disgruntled over the inhumane nature in which they are being treated; denying them fundamental opportunities in the course of their duty; and warnings of being dismissed from work for speaking up on issues affecting them at work. They are denied the chance to enjoy equal privileges with their counterparts at the workplace, which include: 1. Lack of access to loans from commercial institutions for their personal development and to educate their children; 2. They are denied promotions or consideration to join other departments, yet they have trained and have the required qualifications to join the regular police force. Instead the police recruit new individuals from outside the Force: 3. They are not entitled to belong to any pension scheme, hence, have no retirement plan, yet they are always deployed within the stations and are loyal to the service in the Uganda Police Force; 4. They have no opportunities for further training to gain more skills that are required in improving services in the Uganda Police Force; 5. Whenever they open up, seeking their issues to be addressed, they are threatened with sacking and non-renewal of appointment, thus, getting frustrated; and 6. They have written to high offices in the police, but have not seen things change or improve. Madam Speaker, his prayers are: 1. What plans does Government have to ensure that this human resource in the Uganda Police Force is not wasted and their welfare is improved? [Ms Nabbanja] PRIME MINISTER’S TIME
July 2022
The sentence that names Arua District
“4329 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 7 JULY 2022 Hon. Isaac Joakino, MP, Upper Madi County, raised a concern over the misuse of firearms by armed personnel in areas outside their duty stations, which has led to the loss of lives in some parts of Arua District.”
Read the full speech, word for word
4329 THE ELEVENTH PARLIAMENT OF UGANDA THURSDAY, 7 JULY 2022 Hon. Isaac Joakino, MP, Upper Madi County, raised a concern over the misuse of firearms by armed personnel in areas outside their duty stations, which has led to the loss of lives in some parts of Arua District. He requested that the authorities should hold the UPDF personnel accountable, but also meet the medical and burial expenses of the affected victims. Madam Speaker, the Government regrets the death of Alioni Amos, Nicholas Drando and the injuries sustained by Odriru Alice. Private Niwamanya’s actions were not within the scope of his employment. In the spirit of civil-military relations and the need to support the families of the late and the injured victim, the Government has considered giving a start- up contribution of Shs 10 million, per family as compensation to the deceased’s family for the loss of the lives and Shs 2 million to the lady who sustained injuries; the compensation process is ongoing. I wrote a letter soon after getting this question. I beg to move, Madam Speaker.
Nothing here for the year you chose.
Name could mean more than one place
The speaker used a name that fits several places, for example just “Soroti”, which could be the city, the district or an area within them. We show these exactly as spoken and do not choose a meaning for the speaker.
None in the sittings covered.
Nothing here for the year you chose.
JB-20261015-334d3492 · Collected 2026-10-15 · Method v0.1 · Data fingerprint 334d3492b9c7cab76b43f38420e001e0Originals are never edited. Wrong place links are corrected in a public log.